Sr.No.Name of Procuring EntityBrief Description of Award (Start Date-End Date)Total Value (In Crores)Alloted To (Name of Agency)Date of Allotment
1 Ambala City PHED DNIT of Estimate of Strengthening of Sewerage System laying of Sewer line in balance streets in Ambala City. { 23/08/2023 - 12/08/2025 } 7.19 Ashok Kumar Contractor 16/08/2023
2 Ambala City PHED Providing and laying 900mm OD HDPE pipe rising main from Banuri Nakka to Gaggar River , construction of collecting tank and pump chamber { 31/03/2021 - 30/06/2022 } 9.45 M/s Durga Const. Company 31/03/2021
3 Ambala City PHED Baldev Nagar Up-gradation and Commissioning after conversion of existing 5.00 MLD (UNIT-I) and3.25 MLD (Unit – II) capacity Sewage Treatment Plant based on Moving Bed Reactor { 27/06/2022 - 27/12/2023 } 8.74 RAJEEV KUMAR GOEL CONTRACTORS 23/06/2022
4 Ambala City PHED DNIT of Strengthening of Existing 800 mm and 1200 mm ID sewer line by using CIPP (Curved in Place Pipe) technology from timber market chownk near Khera and Arya chownk, Nadi Mohalla to Southern Disposal at Ambala City. { 14/08/2023 - 14/02/2025 } 13.3 V N ENGINEERING COMPANY 07/08/2023
5 Ambala City PHED Moti Nagar Up gradation and commissioning after conversion of existing two units of 5 MLD each sewage treatment Plants based on Moving Bed Biological Reactor Technology (Attached growth process) to combined activated sludge process in conjunction with MBBR Bio film process with addition of Anoxic Tank, Internal Recirculation Pumps, Return activated sludge pumps, Aeration Tank, Treated Effluent Lifting Pumps with common Tertiary Treatment (10 MLD) { 16/02/2022 - 16/08/2023 } 8.39 M/s Sourabh Constructions Private Limited 15/02/2022
6 Ambala City PHED Nayagaon Up-gradation and Renovation of Existing 3.25 mld and 3.0 mld STPs Nayagaon { 01/06/2022 - 30/11/2023 } 6.87 M/s Sourabh Constructions Private Limited 01/06/2022
7 Ambala City PHED special repair estimate Providing and Laying of 250mm ,315mm and 560 mm O/D HDPE Pipe rising main , Construction of RCC manhole of size 0.91X1.53 Mtr, Supplying and installation of non clog submersible sewerage pumping sets { 17/09/2022 - 17/03/2024 } 6.25 Umesh Kumar Contractor 16/09/2022
8 Ambala PHED Barara Cluster-Upgradation of W/S in one Cluster (Mullana) covering 14 Nos. villages, block Barara Distt Ambala under Shyama Parshad Mukherji Rurban Mission (SPMRM) `Instt. of T/Ws, Supplying and erection of Sub P sets, Const. of civil comp laying of dist system connection rising mains, Const. and Commissioning of Boosting Stns with erection of horizontal split casing clear water pumps, Provd Gen sets and all other works { 15/03/2022 - 14/09/2023 } 19.93 ANURAG GOEL 08/03/2022
9 Bawal PHED Master sewerage Scheme Dharuhera Town Distt. Rewari (ON RISK AND COST OF SH. RAJENDER CONTRACTOR R/O HOUSE NO. 5845, SHIVAJI NAGAR, TEH. and DISTT. GURUGRAM) { 01/04/2020 - 30/06/2020 } 5.14 Vinod Manocha, Contractor (3) 16/04/2018
10 Bhiwani PHED No. 1 Up gradation of existing sewege treatment plant of 20 MLD capacity ( 2 Nos x10 MLD each ) based on moving bed reactor (MBBR) technology to tertiary treatment plant located at Dhana Road in Bhiwani Town { 17/03/2021 - 16/09/2022 } 15 Rathee Construction Company 15/03/2021
11 Bhiwani PHED No. 2 Upgradation and Automation of existing gaseous clorination system in the jurisdiction of Public Health Engineering Division No.2 Bhiwani { 19/01/2023 - 02/07/2024 } 10.1 GS ENTERPRISES 12/01/2023
12 Bhiwani PHED No. 2 Up-gradation of Water Supply in Bhiwani Town Under ESP Phase-II. “Construction of RCC Inlet Channel, 2 Nos. RCC Storage and Sedimentation tanks at 2nd Water Works Dinod Road Bhiwani and all other works contingent thereto”. { 26/07/2016 - 26/10/2016 } 25.2 Jai Shree Balaji Const. Co. M/S 02/02/2013
13 Bhiwani PHED No. 3 Design, construction, erection, testing and commissioning of 10 MLD capacity Sewage Treatment Plant based on Moving Bed Sewage Treatment Plant including Operation and Maintenance for 12 months during defect liability period and three years thereafter at Dhana Road Bhiwani town”. { 26/07/2016 - 26/10/2016 } 5.33 Girdhari Lal Aggarwal Contractor Pvt. Ltd. 02/02/2013
14 Bhiwani PHED No. 3 UPGRADATION OF SEWERAGE FACILITIES IN BHIWANI TOWN UNDER ESP PHASE-II. DESIGN, CONSTRUCTION, ERECTION, TESTING AND COMMISSIONING OF INTERMEDIATE PUMPING STATION AT JITUWALA JOHAR AND 15 MLD SEWAGE TREATMENT PLANT BASED ON CYCLIC ACTIVATED SLUDGE PROCESS (SBR) TECHNOLOGY INCLUDING OPERATION and MAINTENANCE FOR 12 MONTHS DEFECT LIABILITY PERIOD AND 5 YEARS THEREAFTER ON BHIWANI DADRI ROAD, BHIWANI TOWN HARYANA. { 26/07/2016 - 26/10/2016 } 11.56 Girdhari Lal Aggarwal Contractor Pvt. Ltd. 07/02/2013
15 Charkhi Dadri PHED Providing canal ased water supply scheme for sirsali Group of 12 No. Village constructing canal based water works at village { 05/04/2020 - 04/10/2021 } 13.47 M/S MAHALAXMI CONSTRUCTION COMPANY 27/03/2020
16 Charkhi Dadri PHED Mehra:- Providing canal based water supply scheme form Mehra Group of 6 No. village constructing canal based water work a village mehra. { 25/03/2020 - 24/08/2021 } 7.92 Suresh Kumar, Contractor 13/03/2020
17 Charkhi Dadri PHED CONSTRUCTION OF 1 STORM WATER DISPOSAL AT KHADI NEAR REST HOUSE INCLUDING COLLECTING TANK, SCREEN CHAMBER, PUMP CHAMBER, PUMPING MACHINERY, SILT CLEARANCE, STORM WATER SEWER LINE AND RISING MAIN LINE FROM DISPOSAL TO STPJHAJJAR ROAD AT CHARKHI DADRI TOWN and ALL OTHER WORKS CONTINGENT THERETO INCLUD { 13/07/2023 - 29/01/2024 } 10.14 Narender Singh Contractor 06/07/2023
18 Charkhi Dadri PHED Proc canal based water supply scheme avillage ninar badesara gr of 35 no. Villages , ` const of raw water pumping station at with intermediate bs at incl o and m of 5 years and all other works contingent thereto { 28/03/2021 - 27/09/2022 } 33.82 M/S S.K.S Construction Company 24/03/2021
19 Charkhi Dadri PHED Upgradation and automation of the existing gaseous chlorination system for rural w/s scheme in PHED Charkhi Dadri { 23/01/2023 - 06/07/2024 } 10.61 GOYAL CONSTRUCTION COMPANY 16/01/2023
20 Charkhi Dadri PHED CHARKHI: AUGMENTATION OF WATER SUPPLY SCHEME OF VILLAGE CHARKHI BY RENOVATION OF EXISTING STRUCTURES, CONSTRUCTION OF 1 B/STATIONS, LAYING THE DI PIPE LINES,DISTRICT CHARKHI DADRI (UNDER CM ANNOUNCEMENT) `Construction of Raw water pumping station, laying the Rising main line, construction of RCC { 13/12/2023 - 07/12/2024 } 7.6 ANAND PIL - JV 06/12/2023
21 Charkhi Dadri PHED Providing and laying HDPE rising main for treated effluent from existing 2 No. STP.s upto drain No. 8 Charkhi Dadri Const. of 1 No. Pump chamber, 1 No. collecting tank at jhajjar road STPs laying of 37700 mtr. { 15/09/2020 - 14/06/2021 } 31.74 Jain Irrigation Systems Limited 02/09/2020
22 Faridabad PHED No. 1 Detailed Project Report for Augmentation Water Supply Scheme at Village Tigaon (95) @155 LPCD Block Faridabad Constituency Tigaon Distt. Faridabad (Under Rural Augmentation) Detailed Project Report Providing Sewerage Facilities and Sewage Treatment Plant at Village Tigaon, Block Faridabad Tehsil and District Faridabad (Under Mahagram Yojna) Under CM Announcement. { 04/06/2019 - 03/12/2020 } 14.33 Mehta Construction co. M/s 04/06/2019
23 Fatehabad PHED Technical Proposal for Augmentation water supply Scheme Bhattu Kalan Tehsil and Distt. Fatehabad. `Const. of RCC Pipe Inlet channel, O and M for 6 year including one year defect liability period after 3 Month trial run and all other works contingent thereto` { 06/09/2022 - 05/03/2024 } 9.27 M/S Vardhman Engineers and Builders 30/08/2022
24 Fatehabad PHED Providing Sewerage Scheme Bhuna Town Tehsil and District Fatehabad “Providing and laying, Joining testing of 200mm, 250mm, 300mm and 400mm S.W. pipe sewer and 600mm dia RCC pipe NP3 Sulphate resistant pipe truck sewer, construction of manhole chambers and construction of Catch Pits for open drain make the connection in the manhole complete at Bhuna Town and all other works contingent thereto { 19/12/2017 - 18/06/2019 } 6.15 Ashok Kumar Contractor S/o Sh. Hans Raj 12/12/2017
25 Fatehabad PHED Augmentation of Water Supply Scheme and Construction of 2nd Water Works Village Gorakhpur Tehsil and . Design, Construction, Testing and commissioning of 1.00 MLD Water Treatment Plant at Old Water Works and 1 MLD Water Treatment Plant 2nd Water works Construction of Raw Water Pumping Station Near Fatehabad Branch at Jandli Kalan Road Gorakhpur { 21/08/2019 - 20/02/2021 } 6.09 Jai Shree Balaji Const Co. Panipat 14/08/2019
26 Fatehabad PHED Construction of Storm Water Disposal Works and Laying of 500 mm o/d HDPE Pipe Rising Main for Disposal of Storm Water from Chilly Lake to Rangoi Nala at Ratia Road Tehsil and District Fatehabad { 15/12/2020 - 14/12/2021 } 6.65 M/s Durga Const. Company 03/12/2020
27 Fatehabad PHED Up-gradation and commissioning after conversion of existing 10 MLD capacity sewage treatment based on moving Bed BRT to combined activated sludge process in conjunction with MBBR Bio film process with, Anoxic Tank, Internal Recirculation Pumps, Treated effluent lifting pumps with tertiary treatment based on Deep Bed Filters followed by chlorination in existing STP complete in al respect { 09/10/2018 - 08/01/2020 } 5.59 Shree Balaji Builders 03/10/2018
28 Fatehabad PHED Aug. of canal based ww Bhuna Town “Const of inlet channel, ss tank, wtp fully automated with PLC/ SCADA system, rwp ump house, cwt, DGH sets and transformers at WW, raising and repair of boundary wall, supply erection, comm of pm, elect, mech piping instrumentation work and laying, jointing, cutting of DI rising main pipe line for Zone No. 1, 2, 3, 4, 5 and 6 of Bhuna town including OandM for 5 years after completion of 3 months trial run { 19/12/2017 - 18/03/2019 } 8.56 Maha laxmi Const. Company M/S 13/12/2017
29 Fatehabad PHED Pro Sew. Sch. Cons of STP for Bhuna Town of Distt Fatehabad ` Des. cons, erection, testing comm of automatic and PLC cont with SCADA 18MLD Main pump station, const of automatic and PLC controlled with SCADA 8.00 MLD STP based on sequential batch reactor (SBR) tech., including laying jointing, cutting and testing of 450 mm dia D.I., Pipe treated effluent rising main and pump chamber treated effluent Includ staff quarters, approach roadsand Others { 19/12/2017 - 18/06/2019 } 10.06 Aparna Const.Company M/S 13/12/2017
30 Gohana PHED No. 1 TENDER NO. 2020_HRY_151667_1-BHAINSWAL KALAN-PROVIDING SEWERAGE SYSTEM (SEWAGE TREATMENT PLANT (STP)) IN VILLAGE BHAINSWAL KALAN DISTT. SONIPAT (NAME OF WORK AS PER DNIT ATTACHED) { 15/01/2021 - 14/07/2022 } 5.75 M/s. SFA and Associates 06/01/2021
31 Gohana PHED No. 1 Tender No. 2022_HRY_206110_1-Up gradation and commissioning after conversion of existing 8.3 MLD capacity sewage treatment Plant based on Moving Bed Biological Reactor Technology (Name of Work as Per DNIT) { 01/04/2022 - 31/03/2023 } 8.64 RAJEEV KUMAR GOEL CONTRACTORS 22/03/2022
32 Gohana PHED No. 1 Tender No. 2020_138952_1- (B) Providing Sewerage System in Village Bhainswal Kalan Mithan and Bhainswal Kalan Bawla (Name as per DNIT) { 01/09/2020 - 31/03/2022 } 10.05 Jai Shree Balaji Const Co. Panipat 20/08/2020
33 Gohana PHED No. 1 Tender No. 2021_HRY_155623_1 - SHAMRI GROUP: DPR FOR PROVIDING RAW WATER TO EXISTING 3 W/W ie SHAMRI, CHIRANA and MUNDLANA FROM JLN CANAL, UPDATING OF EXISTING STRUCTURES OF W/W. CONSTRUCTION OF C/B WATER WORKS AT KAILANA KHAS FOR GROUP OF 3 VILLAGES, PROVIDING FHTC and LAYING OF BALANCE PIPE LINES IN VILLAGES DISTT. SONIPAT. (NAME OF WORK AS PER DNIT) { 01/04/2021 - 31/03/2022 } 7.6 Nafe Singh Contractor 22/03/2021
34 Gurugram PHED Construction of Inlet Channel, Hodies, RCC Sump well, Pump Chamber, Laying, Jointing and Testing of Raw Water rising main from 250 mm to 600 mm i/d D.I. K9 pipe from WW Iqbalpur to W/W Mushedpur, Birhera and Mehchana and Providing canal based water supply in adational 8 Nos. villages and also providing FHTC { 01/08/2021 - 31/01/2023 } 25.71 Narender Singh Contractor 23/06/2021
35 Gurugram PHED Providing, Laying, Jointing, Cutting, Testing, Commissioning 200 mm, 250 mm, 300 mm, 350mm, 400 mm, 450mm S.W. Pipe and 500 mm, 600 mm, 700 mm and 900 mm i/d RCC Np3 pipe sewer, construction of brick masonry manholes chambers and reconstruction of streets with interlocking tiles complete in all respect and and all other works contingent there to in village manesar { 15/07/2018 - 15/07/2019 } 17.04 Jain Construction Co. Hisar M/S 21/06/2018
36 Gurugram PHED Providing, Laying, Jointing, Cutting, Testing, Commissioning 200 mm, 250 mm, 300 mm, 350mm, 400 mm, 450mm S.W. Pipe and 500 mm, 600 mm, 900 mm and 1200 mm i/d RCC Np3 pipe sewer, construction of brick masonary manholes chambers and reconstruction of streets with interloacking tiles complete in all respect and and all other works contingent there to in village Naharpur Kasan { 15/07/2018 - 15/07/2019 } 7.09 Jain Construction Co. Hisar M/S 21/06/2018
37 Hansi PHED Part -A : Kapro :- Upgradation of WS Scheme and Const. of 2nd WW Kapro Distt. Hisar ` Const. of 2 No. RCC FB, 2 Nos RCC CWT at 1st w/w, 400mm i/d RCC NP2 pipe IC, 2 No. B/L S/S Tank, 2 Nos. RCC S/S Well, 2.00MLD WTP, 2 No. RCC CWT, 1 No. PC, B/Wall etc. { 20/09/2019 - 19/03/2021 } 5.59 Bharat bhushan Contractor 19/09/2019
38 Hansi PHED Part – B : Kapro :- Providing sewerage facilities and sewerage treatment plant in village Kapro Distt. Hisar, “ Laying of Sewer line, construction of manhole and House sewer connection intercepting chamber for sewerage system in village Kapro Distt. Hisar and all other work contingent thereto { 20/09/2019 - 19/03/2021 } 8.65 Bharat bhushan Contractor 19/09/2019
39 Hansi PHED Hansi Town :- Providing and laying RCC NP3 pipe in place of damage RCC pipe for storm water drainage scheme in Hansi town Distt. Hisar. ` Providing and Laying of 400mm, 450mm, 600mm ,900 mm i/d RCC NP3 pipe, 315mm o/d HDPE rising main, Const. of manhole in various colonies, supplying and erection 6 Nos. Non clog Sewage Submersible pumping Machinery, Electrical Panel, CI/DI Specials complete in all respect and all other works contingent thereto { 08/01/2021 - 07/01/2022 } 5.51 M/s. SFA and Associates 04/01/2021
40 Hansi PHED KAPRO: PROVIDING SEWERAGE FACILITIES and SEWAGE TREATMENT PLANT IN VILLAGE KAPRO, TEHSIL KHERI CHOPTA, DISTRICT. HISAR “Design, construction, erection, testing and commissioning of 2.50 MLD sewage treatment plant based on sequential batch reactor (SBR) technology complete in all respect including disposal of treated effluent through RCC pipes np-3 by gravity, storm etc. { 01/09/2022 - 28/02/2024 } 6.62 Vinay Kumar Contractor 29/08/2022
41 Hansi PHED Petwar :- Providing Sewerage Facilities In Village Petwar, Tehsil Hansi, District Hisar “Design, construction, erection, testing and commissioning of 2.00 MLD Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including MPS { 23/06/2022 - 22/12/2023 } 5.5 Vinay Kumar Contractor 21/06/2022
42 Hansi PHED Providing sewerage facilities and sewerage treatment plant in village Petwar, Distt. Hisar Under Mahagram Yojna, “Laying of sewerage , construction of manhole and House sewer connection intercepting chamber for sewerage system in village Petwarand all other works contingent thereto { 08/11/2019 - 07/05/2021 } 6.39 Ravinder Sharma Contractor 06/11/2019
43 Hansi PHED Petwar :- Upgradation of WS Sch. under Mahagram Yojna. ` Const. of RCC Open I/C, 2 No. RCC S/S Tank, 2 Nos. RCC S/S Well, 3.00 MLD WTP, 7 No. RCC CWT, 1 No. PC, B/Wall, 2 No. RCC UGC Tank at B/Stn. structures and installations, O and M of W/W for five years and all other works contingent thereto` { 08/11/2019 - 07/05/2021 } 10.94 Ravinder Sharma Contractor 06/11/2019
44 Hansi PHED Hansi Town – Providing and laying of sewer line in balance streets of various colony Hansi Town CM Announcement `Laying of sewer line, construction of main hole, repair and raising of manhole and construction of IPS etc. and all other works contingent thereto { 24/04/2020 - 23/10/2021 } 6.34 M/S Sat Narain Gupta 20/04/2020
45 Hansi PHED Hansi Town:- renovation and Up gradation of 1st and 2nd water Works Hansi Town Distt. Hisar.` Repair of old Water works, Const. of 8.00 MLD WTP scada based structures, Const. of S/S tank Brick lining, Const. of 15.00 MLD WTP scada based, 3 no clear water tank, Raw water s/s tank, pump chamber, Pumpi { 07/12/2023 - 05/05/2026 } 21.55 M/s Shri Balaji Builders. house No. 858-P Sector 33 30/11/2023
46 Hansi PHED Narnaund :- Construction of STP and laying of Branch Sewer in Narnaund Town Distt. Hisar { 02/11/2015 - 01/11/2016 } 5.14 M/S Anant Sunrise Bullseys Infrastructure Pvt. Ltd. 28/10/2015
47 Hansi PHED Sisai Town :- Augmentation of Water Supply scheme Sisai Town Distt. Hisar Sisai Bolan :- Augmentation of Water Supply scheme Sisai Bolan and Sisai Kalirawan Distt. Hisar, `Const. of RCC open inlet channel, 2 No. Bricks lining S/S tank, 2 No. RCC R/W S/S Well, 2 Nos. 2.50 MLD WTP, 2 No. RCC Clear Water Tank, { 04/01/2023 - 03/07/2024 } 12.9 Jasveer singh Contractor 03/01/2023
48 Hansi PHED Hansi Town Up-gradation and comm.. after conversion of existing 7.50 MLD STP based on MBBR to combined activated sludge process in conjunction with MBBR Blo film and to Including O and M of existing STP/MPS during up-gradation period and 3 months of trial run period, 12 months defects liability period after and 5 years thereafter on the commissioning of up-graded STP i.e. completion of Tertiary treatment plant at Lalpura Road, Hansi { 26/10/2022 - 25/04/2024 } 5.36 Vinod Kumar Singal 21/10/2022
49 Hisar PHED No. 1 Adampur Town :- Detail Project Report Augmentation of water supply scheme and strengthening of existing piping network at Adampur Town { 16/03/2023 - 06/09/2024 } 13.42 RAJEEV KUMAR GOEL CONTRACTORS 09/03/2023
50 Hisar PHED No. 1 GANGWA: DETAILED PROJECT REPORT FOR PROVIDING SEWERAGE FACILITY and SEWAGE TREATMENT PLANT AT VILLAGE GANGWA DISTRICT HISAR ( UNDER SWARAN JAYANTI MAHAGRAM YOJNA ) “Construction of 4.50 MLD STP and MPS at village Gangwa District Hisar comprising boundary wall, staff quarter, pump chamber, Treated ef { 21/01/2024 - 17/10/2024 } 8.97 M/s Sourabh Constructions Private Limited 14/01/2024
51 Hisar PHED No. 1 GANGWA (R/W P/STN.) : DETAILED PROJECT REPORT FOR AUGMENTATION OF WATER SUPPLY SCHEME OF VILLAGE GANGWA DISTRICT HISAR. “Construction of Raw water pumping station comprising RCC S/S tank, sump well, pump chamber, inlet channel, boundary wall, rising main lines, raw water pumping machinery, DG set, { 22/01/2024 - 21/01/2025 } 11.52 M/s Sourabh Constructions Private Limited 15/01/2024
52 Hisar PHED No. 1 Adampur: construction of 2 IPS, Laying the sewerage network { 23/09/2023 - 16/03/2025 } 34.5 Jai Shree Balaji Const Co. Panipat 16/09/2023
53 Hisar PHED No. 1 SISWAL SEWERAGE NETWORK: Construction of 1 IPS including wet well sump, screen chamber, pump chamber, boundary wall, pumping machinery, DG set, laying the HDPE pipe rising main line and Laying the sewerage network of different sizes in village including OandM for 12 months during defect liability pe { 12/08/2023 - 11/08/2024 } 11.75 RAJESH KADIYAN 05/08/2023
54 Hisar PHED No. 1 Siswal: Construction of 1 new water works including raw water inlet channel, construction of 2.00 MLD capacity WTP, pump chamber, clear water tank and boundary wall. Construction of additional structures at 1st. water works and Boosting stations. Laying the rising main and distribution pipe lines, { 11/11/2023 - 11/10/2025 } 9 Ravinder Sharma Contractor 04/11/2023
55 Hisar PHED No. 1 SISWAL (STP 2.50 MLD): Design, construction, erection, testing and commissioning of 2.50 MLD Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including MPS with peak factor 3, landscaping, all civil, Electrical, Mechanical work, Piping and Instrument { 02/11/2023 - 01/11/2024 } 7.56 Sh. Himmat Singh Contractor 26/10/2023
56 Hisar PHED No. 1 GANGWA (W/W): DETAILED PROJECT REPORT FOR AUGMENTATION OF WATER SUPPLY SCHEME OF VILLAGE GANGWA DISTRICT HISAR. “Construction of 6.50 MLD WTP at water works of village Gangwa District Hisar including clear water tank, suction / scour well, boundary wall, pumping machinery, DG set, HT metering panel { 22/01/2024 - 21/01/2025 } 6.12 Rohtash Kumar Contractor 15/01/2024
57 Hisar PHED No. 1 ADAMPUR TOWN: Design, construction, erection, testing and commissioning of 5.00 MLD Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including MPS with peak factor 3, landscaping, all civil, Electrical, Mechanical work, Piping and Instrumentation wor { 10/10/2023 - 02/04/2025 } 23 Rohtash Kumar Contractor 05/10/2023
58 Hisar PHED No. 2 Barwala Town Estimate for Providing and laying HDPE Rising main for Treated Effluent from Existing STP to Proposed Pond Distt Hisar. Constt. of RCC Collecting tank, BM PC C.C. Road, Excavation of Pond, Const. of Brick Masonry BW, Laying of HDPE PN-4 PE-80 Rising Main from STP to Pond, Providing and Installation of Pumping Machinery with all accessories and all other works contingent thereto`. { 15/02/2021 - 15/02/2022 } 5.18 M/s. SFA and Associates 10/02/2021
59 Hisar PHED No. 2 STORM BARWALA: PRROVIDING STORM WATER SEWER and DISPOSAL AT BARWALA TOWN DISTRICT HISAR const of 1 MPS and 2 IPS comprising collecting tanks,screen chambers,PChambers,Bwall,Roadandpath.Laying the RCC NP3 storm water sewer and HDPE rising main lies of different sizes. Supply,erection,testing and commissioning of Non clog submersible pump sets, DG set,electric transformer including Defect liability period of 2 mnths after trial run of 3 Mnths { 05/08/2022 - 04/02/2024 } 19.13 The Jagram Bass Co-op L/C Society 29/07/2022
60 Hisar PHED No. 2 MAYYAR: Aug/Reno of W/S scheme including FHTC at village Mayyar Distt. Hisar (Under JJM Cat-II) `Const of 2 No RCC SS Tank, 2 Nos. RCC CWT, RCC SS well, PC, SV Houdi, Earth Filling, Raising of B/Wall, Dismentling of 6 Nos. FB, Const of 1 No. Rapid Sand Filter 1.00 MLD, Pumping Machinery, Disty System, FHTC and U/G CWT, B/wall, PC DI specials, 6` DI R/main, OandM of WTP of 1.00 MLD for 5 yrs after 12 mnths defect liability period after 3 mnths { 31/03/2022 - 30/03/2023 } 5.41 Suresh Kumar, Contractor 24/03/2022
61 Hisar PHED No. 2 DETAILED PROJECT REPORT FOR AUGMENTATION and UPGRADATION OF WATER SUPPLY SCHEME(ADDITIONAL STRUCTURES,RENOVATIONandSTRENGTHENING OF EXISTING STRUCTURES) OF BARWALA TOWN DISTT. HISAR”. “Design, Const, Testing and Commissioning Of 8.5 MLD Plc and Scada Based WTP, CWT At Mt WW . Cons At Newly Acquired Land. OandM For 12 Mnths During Defect Liability Period After Trial Run Of 3 Mnths, 5 Yrs Thereafter. { 18/10/2022 - 17/04/2024 } 21.08 M/s Sourabh Constructions Private Limited 11/10/2022
62 Hisar PHED No. 3 Providing sewerage scheme left side area of Phatak Paar Kaimri Raod Hisar Const,. of 4.00 MLD MPS and STP and all other { 08/02/2016 - 07/01/2017 } 5.59 M/s Vardhman Builders 03/02/2016
63 Hisar PHED No. 3 Aug. Sewerage Scheme Hansi Town (Under State plan)Designing, Constructing, Testing, Commissioning of 6.5MLD Sewage Treatment Plant { 23/09/2016 - 22/03/2018 } 5.54 SCC EICPL (JV M/s SHiv Const. Co. and M/s Enviro Infra Engineer Co.Ltd. 2120 U.E Jind) 16/09/2016
64 Hisar PHED No. 3 Aug Sew Scheme for Hissar Town “Design, Construction, Erection, Testing and Commissioning of 40.0 MLD Capacity STP based on SBR complete in all respect including B/W, Staff Quarters, Approach Roads, Landscaping, MCC Panel Room, CCTV Cameras Transformer, DG Set and all other contingent Electrical, Mechanical, Piping and Instrumentation works at Sewage Treatment Plant on PLC and SCADA, Disposal of Treated { 07/12/2015 - 06/06/2017 } 29.74 Girdhari Lal Aggarwal Contractor Pvt. Ltd. 01/12/2015
65 Hisar PHED No. 3 Design Const. testing comm. of 5 MLD capacity STP based on SBR Tech. Incl. Staff Quarters Approach Roads Landscaping MCC Panel Room CCTV Cameras Transformer DG set Electrical Mech Piping and Instrumentation works at STP on PLC and SCADA disposal of treated effluent , laying of Rising Main from existing MPS to proposed STP including OandM 12 Months during defect liability period after trial run of 3 mon. and 5 years thereafter at Hisar { 17/05/2021 - 16/11/2022 } 6.17 M/s Shiv Construction Company Jind 13/05/2021
66 Hisar PHED No. 3 ESTIMATE FOR SHIFTING OF EXISTING STORM WATER DRAIN BY HDPE PIPE LINE ALONG 45 MTR WIDE SECTOR-14 and SECTOR-33 DIVIDING ROAD REQUIRED DUE TO LAND ACQUISITION BY HSVP HISAR AT EXISTING SITE OF STORM WATER DRAIN IN SECTOR-33 HISAR,CONSTRUCTION OF COVERED BOX TYPE STORM WATER DRAIN INSIDE GURU JAMBHE { 20/07/2023 - 10/01/2025 } 56 Jain Construction Co. Hisar M/S 08/07/2023
67 Jhajjar PHED No. 3 Shyama Parsad Mukherji Rurban Mission (Badli Cluster) 17 Nos. villages, District Jhajjar, up-gradation of water supply schemes from 70 to 135 LPCD for 12 villages falls under PHED No. 3, Jhajjar, District Jhajjar { 01/10/2019 - 31/03/2021 } 6.75 Chahar Construction Co. 11/09/2019
68 Jhajjar PHED No. 3 Jhajjar Town :- Estimate for Repair / Strengthening of existing Sewerline of (600 mm i/d ) Near Bikaner Chowk to Yadav Dharamsala , Mata Gate to Sita Ram Gate , (700 mm i/d) Near Gaji Kamal Mandir to Comminuity Center and (900 mm i/d) Near Katcha Silani Road to STP 5.5 MLD and Yadav Dharamsala { 24/02/2023 - 21/12/2023 } 6.38 V N ENGINEERING COMPANY 23/02/2023
69 Jhajjar PHED No. 3 Upgradation and commissioning after conversion of exist 2 Nos. 5.5 MLD Kosli Rd, JJR and 5.0 MLD Sampla Rd, JJR cap STP based on MBBR Tech. Attached growth process to combined activated sludge process in conjunction with MBBR Bio film process with TTP based on Dual Media Filters followed by Chlorination in exist STPs complete and all other works contingent there to including OandM of exist STP/MPS { 07/11/2022 - 06/05/2024 } 11.23 RAJEEV KUMAR GOEL CONTRACTORS 07/11/2022
70 Jind PHED No. 1 Construction of canal based water works for gr. of 5 No. Villages i.e. Dalamwala, Bohatwala, Khokhri, Haibatpur and Mando at village Khokhri ( Hansi Branch RD 17400/L) and laying of pipe with FHTC in village Dalamwala Distt. Jind. { 17/05/2023 - 10/06/2025 } 14.6 RAJEEV KUMAR GOEL CONTRACTORS 10/05/2023
71 Jind PHED No. 1 Providing and laying of sewerline in newly approved colonies and construction of STP for Jind town { 24/11/2017 - 23/05/2019 } 11.12 The Dikadla Co.op.L/C Society Ltd.,Dikadla Tehsil Samalkha Distt. Panipat. 16/11/2017
72 Jind PHED No. 1 Providing and laying of 560 mm o/d HDPE Rising Main for sewerage from 5 MLD Existing STP (Ahirka) to Kalwa-Kinana Drain for Jind town Distt. Jind,`Design, Construction, Erection, Testing and Commissioning of 560 mm o/d HDPE rising main from 5 MLD Existing MLD to Kalwa-Kinana Drain etc. { 01/10/2019 - 30/09/2020 } 16 Jain Irrigation Systems Limited 18/09/2019
73 Jind PHED No. 1 Providing and laying of sewerline in newly approved colonies and construction of STP for Jind Town, `design, construction, erection, testing and commissioning of automatic and PLC controlled with SCADA 7 MLD STP { 27/12/2017 - 26/06/2019 } 7.76 M/s Shiv Construction Company Jind 18/12/2017
74 Jind PHED No. 1 Up gradation and commissioning after conversion of existing 15 MLD capacity sewage treatment based on Moving Bed Biological Reactor Technology (Attached growth process) to combined activated sludge process in conjunction with MBBR Bio film process with addition of Anoxic Tank, Internal Recirculation Pumps, Treated Effluent Lifting Pumps with Tertiary Treatment. { 16/05/2018 - 15/08/2019 } 8.39 M/s Shiv Construction Company Jind 11/05/2018
75 Jind PHED No. 2 Siwanamal:- Prov. Raw water arrangement by lifting from Butana Branch at RD 58797-R for Canal base water works Bagru Kalan Gr. of 6 No. villages and Distribution system with FHTC for Village SIwanamal Distt. Jind (under Jal Jeevan Mission). { 16/01/2023 - 23/08/2025 } 9.65 Rohtash Kumar Contractor 09/01/2023
76 Jind PHED No. 2 Muana:- Aug. Water Supply Scheme for village Muana under Mahagarm Yojna { 16/09/2019 - 15/03/2021 } 8.26 M/s COMPETENT BUILDERS AND CONTRACTORS 12/09/2019
77 Jind PHED No. 2 Muana:Prov. Sewerage System in Village Muana Distt. Jind { 16/09/2019 - 15/03/2021 } 10.71 M/s COMPETENT BUILDERS AND CONTRACTORS 12/09/2019
78 Kaithal PHED No. 1 Padla- Estimate for installation of Solar Power Plants on existing tubewell based in various rural Water Supply Scheme under PHESD No. 2 Kaithal District Kaithal `Providing and installation of solar power plant on existing tubewell based in various rural water supply scheme under PHESD No. 2 Kaithal { 05/03/2024 - 05/03/2025 } 5.84 Arya Electric Company Prop. Varun Kumar 27/02/2024
79 Kaithal PHED No. 1 E-Tender No. 106911- Pai(Adarsh village) Revised estimate for Up-gradation of water supply Pai Tehsil Pundri District Kaithal “Design , testing commissioning of authomated PLC controlled SCADA based water purification plant of 1.00 MGD (4.54 MLD) capacity at 2nd water works Pai construction of 1 No. S/S Tank and 2 No. RCC Clear Water Tank working depth and supplying and installation of 2 Nos Horizontal split { 08/03/2019 - 07/03/2020 } 6.39 Rohtash Kumar Contractor 26/02/2019
80 Kaithal PHED No. 1 Pai-Providing Sewerage System in village Pai Design, Const. erection testing and commissioning of MPS of 3.50 MLD with peak factor 2.5 and STP of 3.50 MLD based on SBR laying of 400 mm i/d HDPE pipe of length 1600 mtr for disposal of Treated Effluent from STP to drain including Room, CCTV cameras, Transformer, DG set independent feeder at STP including OandM of 12 months run of 3 months and 10 years { 21/06/2019 - 20/06/2020 } 5.85 U.B.A. Constructions 13/06/2019
81 Kaithal PHED No. 1 Construction of Sewage Treatment Plant and Sewerage Network in village Keorak Tehsil and District Kaithal `Supplying, laying jointing and testing of stone ware (SW) pipes of 200 mm to 400 mm and 450 mm and 500 mm of RCC NP3 pipes and construction of brick masonary manhole chamber and SFRC manhole coveres and frames and all other works contingent thereto` { 14/08/2017 - 06/08/2019 } 6.34 Umesh Kumar Contractor 10/08/2017
82 Kaithal PHED No. 1 E-Tender No. 71803- Upgradation of Water Supply Scheme Pai District Kaithal “Laying , jointing , cutting and testing of DI distribution network of 100 mm to 500 mm and all other works contingent thereto and sewerage system in village Pai, “Supplying, laying, jointing and testing stone ware pipes of 100 mm to 400 mm and construction of brick masonary manhole chambers and SFRC manhole covers and frames and all other works contingent thereto.” { 27/04/2018 - 26/01/2019 } 9.42 Ashok Kumar Contractor 25/04/2018
83 Kaithal PHED No. 1 E-Tender No. 2022_HRY_245775_1: Kaithal Town- Augmentation and Updation/ Renovation of Partham Water Works Peoda Road at Kaithal Town `Providing and Laying of RCC Box Type Inlet Channel RCC Pipe Channel 700 mm i/d NP3, Construction of 2 No. S/S Tanks of Mean Size 845` x 215` x 18` and 478` x 348` x 18`, RCC Raw water Suction Well, Raising of Boundary wall , Head Works at Partham Water Works Peoda Road Kaithal { 01/01/2023 - 31/12/2024 } 5.11 Ashok Kumar Contractor 28/12/2022
84 Kaithal PHED No. 1 E-Tender No. 71803- Upgradation of Water Supply Scheme Pai District Kaithal “Laying , jointing , cutting and testing of DI distribution network of 100 mm to 500 mm and all other works contingent thereto and sewerage system in village Pai, “Supplying, laying, jointing and testing stone ware pipes of 100 mm to 400 mm and construction of brick masonary manhole chambers and SFRC manhole covers and frames and all other works contingent thereto.” { 27/04/2018 - 20/04/2020 } 9.42 Ashok Kumar Contractor 25/04/2018
85 Kaithal PHED No. 1 Kaul-Detail Project Report for providing sewerage network and construction of sewerage treatment plant in village Kaul, Block Pundri District Kaithal (Under NABARD) { 01/04/2023 - 03/04/2023 } 10.91 Nar singh Goel 17/03/2023
86 Kaithal PHED No. 1 Pharal-Detailed Project Report for providing sewerage network and construction of Sewage Treatment Plant in village Pharal, Block Pundri District Kaithal (under Swaran Jayanti Mahagram Yojna) Uunder NABARD `Laying of sewerage network and construction of manhole and all other works contingent thereto { 06/09/2023 - 08/09/2023 } 7.25 Jasveer singh Contractor 22/08/2023
87 Kaithal PHED No. 2 Bhagal :- DPR for Construction of Sewage Treatment Plant in VIllage Bhagal District Kaithal of Haryana State Financed by NABARD `Laying of Main Sewer Line 200mm SW, 250mm SW, 300mm SW, 400mm SW, Laying of 450mm and 500mm HDPE PN4 Pipe, and Laying of Leteral Sewer Line 200mm SW, Restoratrion of Hous { 24/07/2023 - 04/04/2024 } 8.99 ANURAG GOEL 17/07/2023
88 Kaithal PHED No. 2 Construction of Sewerage Treatment Plant and Sewerage Network in village Siwan Tehsil Guhla Distt. Kaithal,” Supplying, Laying, Jointing and testing of stone ware pipes of 200mm to 400mm and 500mm to 600mm of RCC NP3 pipes and construction of Brick masonry Manhole chambers and SFRC Manhole covers and frames and all other works contingent thereto { 16/08/2017 - 15/05/2018 } 10.54 Rohtash Kumar Contractor 09/08/2017
89 Kaithal PHED No. 2 Siwan Detail Project Report for construction of Sewage Treatment Plant and Sewerage Network in village Siwan Tehsil Guhla and Distt Kaithal (Haryana) “Design, Construction, erection, testing and Commissioning of main pumping station of 4.50 MLD with peak factor 2.50 consisting of collecting tank with screening with chamber size, village Siwan Tehsil Guhla and District Kaithal Haryana. { 10/09/2019 - 09/09/2020 } 12.8 V.S.Enterprises 06/09/2019
90 Karnal PHED No. 1 Karnal: -Laying/Replacement of DI Pipe for WS, 14 No. TW and Submersible pummping set, 150mm Rising main. -_ { 10/07/2023 - 09/07/2024 } 9.26 M/S R.N. JAIN CONTRACTORS 03/07/2023
91 Karnal PHED No. 1 Karnal: -Laying/Replacement of DI Pipe for WS, 14 No. TW and Submersible pummping set, 150mm Rising main { 03/07/2023 - 09/07/2024 } 9.26 R.N. Jain Contractor 03/07/2023
92 Karnal PHED No. 1 Nighdu:-Aug. of Sewerage Scheme for Village Nighdu,Karnal under Swaran Jayanti Mahagram Yojna. “Prov laying cutting jointing of 200 mm, 250 mm, 300 mm and 400 mm SW pipe RCC NP3 Pipe sewer const. of Manhole chamber, incerptng chamber prov house sewer conn. as per standard drawing operation, mtc. for 12 mnths during defect liability period after trial and 5 year { 16/08/2019 - 15/08/2020 } 8.72 ANURAG GOEL 13/08/2019
93 Karnal PHED No. 2 Design, Construction, Erection, testing and commissioning of automatic and PLC controlled with SCADA 4 MLD STP maim pumping station, const. of automatic and PLC controlled with SCADA 4 MLD STP { 01/06/2018 - 30/11/2019 } 6.41 Jai Shree Balaji Const Co. Panipat 01/06/2018
94 Karnal PHED No. 2 Up-gradation of water supply and providing sewerage system in village Kohand Block Gharaunda Distt. Karnal “Providing, Laying, Jointing, cutting and testing of Sewerage Network System of S.W. pipe size 200 mm dia, 250 mm dia, 300 mm dia, 400 mm dia and 500 mm dia, construction of manhole, Construction of interceptic chamber, making of household connections. Operation and maintenance of water supply scheme and Sewerage Network System { 18/09/2020 - 17/03/2022 } 6.1 M/s M.R Construction Company Kaithal 08/09/2020
95 Kosli PHED Detailed Project for upgradation of W/S system from 70 LPCD to 135 LPCD for 08 Nos. covered under SPMRM, ` Const. of 02 Nos. Inde. canal based W/W for village Bhakli and Chawwa including all required electrical and mechanical equipments. { 10/06/2020 - 09/12/2021 } 6.49 Rakesh Yadav 02/06/2020
96 Kosli PHED Upgradation of exist. 3 MLD STP, laying of 450 mm i/d HDPE pipe rising main from STP to drain. 8 and balance sewer lines. `Upgradation of sewerage Treatment Plant (STP) of 3.00 MLD capacity based on moving bed bio rector (MBBR) technology located at near govt. ITI, Rewari road Kosli. { 21/11/2022 - 20/05/2024 } 6 Rathee Construction Company 18/11/2022
97 Kurukshetra PHED Tender no.104789_1 Providing Sewerage network and construction of sewage treatment plant in ismailabad town { 28/11/2019 - 27/05/2021 } 9.55 Inderjeet Singh Contractor 13/11/2019
98 Mandi Dabwali PHED MANDI DABWALI - Updating, Renovation of Water Works, Construction of 2 nos. Boosting Stations and Providing and Laying of Water Supply Distribution System at Mandi Dabwali Distt. Sirsa. `Providing and Laying of 900mm i/d RCC Pipe Channel 490 mtrs., Construction of 2 No. S/S Tanks, Raw water and Clear water Suction Well, Re-Construction of Boundary wall at water Works, Boundary wall at B/Stn. Chouhan Nagar, etc. { 25/05/2022 - 24/11/2023 } 6.42 M/S Sat Narain Gupta 17/05/2022
99 Mandi Dabwali PHED Providing and Laying of Sewerage System in Recently Approved Colonies at Mandi Dabwali Distt. Sirsa. Providing and laying of Sewer Lines i.e. 200mm, 250mm, 300mm dia S.W. pipe in recently approved colonies and 280mm o d Rising Main HDPE Pipe PE80 grade and PN4 from Proposed IPS to existing 16.50 MLD STP at Mandi Dabwali Town Distt. Sirsa { 21/09/2020 - 20/09/2021 } 5.19 MANGAT RAI 14/09/2020
100 Mandi Dabwali PHED Augmentation water supply scheme to Village Ganga Distt. Sirsa. Providing and laying of 700mm dia RCC Pipe Class NP-2 and construction of SS Tank 1 No., S/S Tank 1 No., RW Water Suction and CW Scour Tank, RCC High Level Tank 1 No., Filtration Plant - 2 MLD SCADA based - 1 No., RCC Clear Water Tank 3 No., Pump Chamber with RCC Column , Boundary Wall, Toilet Block 1 No., etc. and all other works contingent thereto { 19/08/2019 - 18/02/2021 } 5.65 M/s Balaji Construction Company 14/08/2019
101 Mandi Dabwali PHED Providing Sewerage System and construction of STP at Village Ganga Distt. Sirsa. Providing and laying of various sizes of Sewerage Lines and construction of manholes, 1 No. Collecting tank and screening chamber, inspection chamber, pump chamber, Boundary Wall with Iron Gate, Rising Main, Toilet Block, Staff Quarter, Instt. of pumping machinery and all required Electrical, Mechanical Equipment’s etc. at village Ganga. { 19/08/2019 - 18/02/2021 } 9.99 M/s Balaji Construction Company 14/08/2019
102 Mohindergarh PHED Upgradation of existing 6.5 MLD capacity sewerage treatment on moving bed biological reactor technology to combined activated sludge process in conjunctions with MBBR BIO film process with addition of new Mechanical Coarse and Fine Screens, Anoxic Tank, Internal Rec Pumps , Treated Effluent Lifting { 14/10/2021 - 13/04/2023 } 5.19 Rathee Construction Company 30/09/2021
103 Mohindergarh PHED Part-1 W/s- Aug. of drinkig w/s scheme for 25 Nos villages on Canal based . Part-2 Sewerage System Prov. sewerage system in village Satnali Distt. Mohindergarh (Under Swaran Jayanti Mahagram Yajna)`Laying of Sewerage network of various size of construction of Manholes in village Satnali OandM of 5 Years including defect liability period after trial run period of 3 Months and all other works contingent there to. { 17/01/2019 - 16/01/2020 } 7.61 Vikash Badesra Contt. 09/01/2019
104 Mohindergarh PHED MGarh, Design, Const., Testing, Comm., Op.andMtc. for 3 Y after defect liability period of 12 M. Laying 700mm RCC pipe NP2 I/C, SandS tank, PC, RW and CW S/W, 5.50MLD WTP,B/W,S/Q, P/Mach, transformer and all elect. mech, instt., dev of W/W Dewas, 1 No. UGT, PC, S/Q, CW P/mach, transformer and all elect, mech instt., dev of BS land scaping, horticulture at BS, Laying of DI K9 R/M from Dewas W/W to main BS to diff. BS { 26/07/2016 - 26/10/2016 } 7.34 M/S Bansal const co 15/09/2010
105 Naraingarh PHED Sewerage Network Bilaspur, Providing sewerage facilities in village Bilaspur Distt. Yamuna Nagar (Under Mahagram) Laying of sewer line etc. { 04/08/2022 - 03/08/2023 } 10.57 ANURAG GOEL 04/08/2022
106 Naraingarh PHED Sadhoura, Big villages Detail Project Report for water supply scheme TW, booster and pipe line. { 28/09/2017 - 31/03/2019 } 10.26 Inderjeet Singh Contractor 20/09/2017
107 Naraingarh PHED Sadhoura Big village Detail Project Report for Sewerage system Sadhoura (Mahagram) { 28/09/2017 - 31/03/2019 } 10.26 Inderjeet Singh Contractor 20/09/2017
108 Narnaul PHED No. 1 Design, construction, erection and commissioning of STP of Capacity 3.00 MLD on SBR technology, MPS of Capacity 9.00 MLD, laying of 600 mm i/d RCC NP-3 pipe treated effluent channel, construction of 1 No. Staff Quarter, boundary wall, CC Path, land scaping, MCC Panel Room, 5 Nos. CCTV Cameras, Electric Transformer, D.G. Set and all other contingent electrical, mechanical piping { 01/03/2021 - 28/02/2022 } 6.08 Shree Balaji Builders 26/02/2021
109 Narnaul PHED No. 1 Nangal Choudhary Sewerage, Construction of Sewage Treatment Plant and laying of sewer in M.C. area Nangal Choudhary, Tehsil Narnaul, District Mohindergarh. “Laying, jointing and cutting of 200 mm i/d, 250 mm i/d, 300 mm i/d and 400 mm i/d S.W. pipe sewer and 500 mm i/d, 600 mm i/d and 750 mm i/d RCC pipe NP3 sewer, construction of manholes and all other works contingent thereto { 07/12/2015 - 06/12/2016 } 6.18 Shree Balaji Builders 02/12/2015
110 Narnaul PHED No. 1 Narnaul - Augmentation of canal based water supply scheme, Distt. M/Garh. “Laying of connecting Inlet Channel, construction of 1 No. RCC S.andS. Tank, 1 No. Pump Chamber, 4 Nos. Staff Quarters, Construction and Raising of boudnary wall including all required electrical and mechanical equipment, Approach Path and laying of pipe line at head works at Canal Based Water Works Nasibpur and Rewari Road and all other work contingent thereto { 22/10/2018 - 21/10/2019 } 17.01 Rathee Construction Company 18/10/2018
111 Narnaul PHED No. 2 Aug. of Drinking water supply scheme (canal based) for 122 Nos. villages @40 LPCD to 70LPCD in Narnaul Tehsil, District Mohindergarh. `Design, Construction and commissioning of 13.00 MLD SCADA based water treatment plant at WW Lehroda, 2 SandS tank, 1 no. Clear water tank, 1 No. Pump Chamber. { 18/09/2019 - 17/03/2021 } 13.44 Rathee Construction Company 18/09/2019
112 Narnaul PHED No. 2 Up gradation of existing 7.50 MLD capacity sewage treatment plant on Moving Bed Biological Reactor Technology (Attached growth process) to combined activated sludge process in conjunction with MBBR Bio film process with addition of new Mechanical Coarse and Fine Screens, Anoxic Tank, Internal Recirculation Pumps, at Narnaul Town Distt. Mahendergarh. { 01/06/2021 - 30/11/2022 } 5.84 Rathee Construction Company 26/05/2021
113 Narnaul PHED No. 2 Satnali Village Aug. of Drinking W/s Scheme 25 Nos villages“Construction of 1 Raw water Pumping station, 1 water work, 4 IBS, 32 VBS at different villages comprising Design, Construction, Testing and Commissioning of 8.50 MLD SCADA based water Treatment plant, Balancing capacity reservoir, S and S Tanks, Clear waterTanks, Pump chambers, Boundary wall, R/W and C/W Rising main lines, Internal Distribution of 25 villages and 9 Dhanies. { 14/02/2019 - 13/02/2020 } 34.34 ANAND ENGINEERS 06/02/2019
114 Narnaul PHED No. 3 Augmentation of Water supply scheme (Canal based) Water works at Bhalkhi for 61 Nos. villages, Tehsil Ateli Mandi, District Mohindergarh. “Construction of 3 Nos. Main Boosting Stations, 5 Nos. Intermediate Boosting Station and 38 No. Village Boosting Stations, Laying of 75672 Mtr. D.I. Rising Main lines of different sizes, 16790 Mtr. connecting pipelines of various boosting stations, and all other works contingent thereto”. { 24/09/2020 - 23/03/2021 } 19.44 Shree Balaji Builders 21/09/2020
115 Narnaul PHED No. 3 Gahra : DPR FOR AUGUMENTATION CANAL BASED WATER SUPPLY SCHEME FOR VILLAGE GAHRA GROUP OF 29 NOS. VILLAGES and 2 Nos. DHANIES DISTRICT MOHINDERGARH. (E/COST RS. 9976.66 LAKH.) Gahra : Construction of Raw water Pumping Station Near M.G. Canal and Independent water works Village Gahra, District Mohindergarh “Const. of 1 No. Main Boosting Station (MBS), 7 Nos. Intermediate Boosting Station (IBS) and 25 Nos. Village Boosting Station (VBS), { 16/12/2022 - 15/12/2024 } 17.79 Jasveer singh Contractor 15/12/2022
116 Narnaul PHED No. 3 DPR FOR AUGUMENTATION CANAL BASED WATER SUPPLY SCHEME FOR VILLAGE GAHRA GROUP OF 29 NOS VILLAGES and 2 NOS. DHANIES DISTT. MOHINDERGARH. E/C – 9976.66 Lakh “Construction of Raw water Pumping Station Near M.G. Canal and Independent water works Village Gahra Distt. Mohinder Garh. { 19/01/2022 - 18/01/2023 } 21.4 Rakesh Yadav 17/01/2022
117 Narnaul PHED No. 3 Augmentation of Water supply scheme (Canal based) Water works at Bhalkhi for 61 Nos. villages, Tehsil Ateli Mandi, District Mohindergarh. “Construction of Water works at Bhalkhi village comprising design, Construction and commissioning of 12.50 MLD SCADA based water treatment plant at Bhalkhi { 20/02/2019 - 19/08/2020 } 15.75 Anand Kumar Contt. 08/02/2019
118 Narwana PHED Uchana Khurd:- Estimate for development of villages i.e. Bhagwanpura, Nachar Khera, Daroli Khera, Kheri Masania and Uchana Khurd of Uchana Kalan constituency under Shyama Prasad Mukherji Rurban Mission Distt. Jind ( Deposit Work) ` Construction of 2 No. independent canal based water works i.e. Nacha { 14/08/2023 - 05/01/2026 } 5.19 Nafe Singh Contractor 07/08/2023
119 Narwana PHED MAKHAND :- PROVIDING RAW WATER ARRANGEMENT BY PUMPING FROM BARWALA BRANCH AT RD 51000 - L AT W/W MAKHAND FOR 7 NO. W/W OF UCHANA CONSTITUENCY, CONSTRUCTION OF WATER WORKS VILL. BHONSLA DISTT. JIND.` Raw water main pumping station at water works Makhand, Raw water intermediate pumping station at wat { 02/10/2023 - 05/11/2024 } 6.03 M/s AAR PEE Construction Co. 25/09/2023
120 Narwana PHED Narwana Town-Estimate to create Tertiary Treatment facility at 03 nos. Sewerage Treatment Plant of capacity 3.75 LD, 3.50 MLD and 2.00 MLD based on MBBR Technologies followed by chlorination in Narwana Town Distt. Jind. “ Up-gradation of existing sewerage treatment plant ( STP ) of 3.75 MLD, 3.50 MLD and 2.00 MLD capacity based on Moving Bed Bio Reactor (MBBR) technology located at Narwana Town, Jind City { 07/06/2021 - 06/12/2022 } 7.21 HITECH ENVIRO ENGINEERS AND CONSULTANTS PVT. LTD 26/05/2021
121 Nuh (P) PHED No. 1 F.P Jhirka Town- Construction new STP of 6 MLD Capacity on SBR technology in place of old STP of 5 MLD capacity based on MBBR technology Madapur Road, F.P Jhirka Town, Distt. Nuh { 30/09/2023 - 29/09/2024 } 8.96 HYDROTECH PARYAVARN INDIA PVT. LTD. 20/09/2023
122 Nuh (P) PHED No. 1 Aug. drinking WS in Quality affect 80 vill. from Yamuna Flood Plain by const. Ranney well and deep TWs in Atba/ Sultapur `Const. of 1 Ranney well, MBS in vill. atba, Malhaka and Mahoon and Pump machy. Indep. feeder for Ranney well and MBS Atba, Malhaka, laying of 400mm i/d DI rising main from R/well to MBS Atba with 3 month trial period after commissioning, 5 Yrs mtc. including 1 Year defect liabiltiy period and other works contingent thereto` { 16/07/2018 - 15/01/2020 } 30.26 KNK Projects Pvt Ltd 06/07/2018
123 Nuh (P) PHED No. 1 F.P.Jhirka town- Aug. drinking w/s in quality affected 80 villages and 1 F.P.Jhirka town from Yamuna flood plain “Const. of 1 No. R/well, const. of MBS in village Atba, Malhaka and Mahoon and Pump Machy., I/d feeder for R/well and MBS Atba and MBS Malhaka, laying, jointing, testing and commissioning of 400mm i/d DI Rising main from R/well to MBS Atba”. (Part-B) For adjustment of proportionate cost of F.P.Jhirka Town. { 16/07/2018 - 15/01/2020 } 18 KNK Projects Pvt Ltd 06/07/2018
124 Nuh (P) PHED No. 1 Ranneywell-Aug. w/s sch. in quality aff. 80 no. vill. of F.P.Jhirka and Nagina Block and 1 No. town F.P.Jhirka from Yamuna Flood Plain by const. R/well and deep TW in Atba. `Laying, jointing, testing and comm. of 900mm r/main from MBS Atba to MBS Malhaka upto MBS Mahoon, Const. of 8 No. Steel bridge, Crossing of R/line with 3 mths trial run after comm. 5 year OandM including 1 year defect liability period andall other works contingent thereto` { 16/07/2018 - 15/01/2020 } 14.3 Chahar Construction Co. 06/07/2018
125 Nuh (P) PHED No. 1 Aug. w/s in Quality aff. 80 vill. of F.P.Jhirka and Block Nagina and 1 town from Yamuna flood plain by const. Ranney well and TWs in village Atba `Laying, testing commissioning of 900mm i/d DI rising main from MBS Atba to MBS Malhaka upto MBS Mahoon, Const. of 8 No. steel truss bridge , crossing of Railway line, and NH with 3 months trial run after commissioning 5 yr mtc.. i/c 1 yr. defect liability period. { 16/07/2018 - 15/01/2020 } 14.3 Chahar Construction Co. 06/07/2018
126 Nuh (P) PHED No. 1 Nuh Town- Rough cost estt. For upgradation of existing 3.60 MLD STP based on MBBR Technology with Anoxic tank Activated sludge tank i.e completion of Tertiary Treatment Plant at Jobgipur Road Nuh Town. { 22/09/2023 - 21/09/2024 } 5.09 M/s H.L. Handa and Company 12/09/2023
127 Nuh (P) PHED No. 1 Tauru Town- Upgradation of existing 4.50 MLD STP based on MBBR Technology with Anoxic Tank, Activated sludge tank i.e. completion of tertiary treatment plant Pataudi Road, Taoru Town. { 06/10/2023 - 30/09/2024 } 6.59 RAJEEV KUMAR GOEL CONTRACTORS 29/09/2023
128 Nuh (P) PHED No. 1 Aug. w/s sch. in quality aff. 80 no. vill. of F.P.Jhirka and Nagina Block and 1 No. town F.P.Jhirka from Yamuna Flood Plain by const. R/well and deep TW in Atba. `Laying, jointing, testing and comm. of r/main from MBS Mahoon to 4 No. IBS, Const. of 4 No. IBS each in Sakras, Naryala Ferozepur, Kameda and Agon with 3 mths trial run after comm. 5 year OandM including 1 year defect liability period andall other works contingent thereto` { 21/09/2018 - 20/09/2019 } 9.8 Narender Singh Contractor 13/09/2018
129 Nuh (P) PHED No. 1 Aug. WS sch. in Quality aff. 80 Nos. vill. `Laying, Jointing and testing of Sub R/ main from MBS Malhaka to vill. Baded and Dondal, IBS Mahun, Sakras, Naryala, Kameda and Agon to SBS in various vill, IBS Mahun to F.P Jhirka Town, const. of 105 No. SBSs, from 25 KL to 175 KL, P/F of p. Machy. for SBS, laying of distr. PL in various vill. with 3 M trial run, 5 yr O and M after 1 year defect liability period and other works contingent thereto`. { 04/06/2019 - 03/06/2020 } 26.38 Narender Singh Contractor 27/05/2019
130 Nuh (P) PHED No. 1 Aug.W/S sch.in Q affected 80 Nos. vill. of F.P Jhirka and Nagina Block and 1 NO. Town F.P Jhirka `Laying of Sub R/main from MBS Malhaka to village Baded and Dondal, IBS Mahun, Sakras, Naryala, Kameda and Agon to SBS in various vill, IBS Mahun to F.P Jhirka Town, construction of 105 No. SBSs, from 25 KL to 175 KL, P/F P/machy for SBS, laying of distri. PL in various villages (Part-B) For adjustment of proportionate cost of F.P.Jhirka Town. { 04/06/2019 - 03/06/2020 } 26.38 Narender Singh Contractor 27/05/2019
131 Nuh (P) PHED No. 1 Supplementary estimate for Augmentation drinking water supply scheme Affected 80 no. villages of Ferozepur Jhirka Assembly Constituency ` Const. of 42 No. SBS, 20 no. Haudies, 100mm and 150mm rising main, 82 no. Pump chamber and const. of Boundary wall and all other works contingent thereto` { 29/03/2023 - 10/08/2023 } 11.51 Narender Singh Contractor 10/02/2023
132 Nuh (P) PHED No. 1 Sakras- Prov. and laying sewerage system. Inst. of 14 TW and pump sets, const. of 4 UGT, laying of DI rising main including 5 years OandM after 1 year defect liability period after commissioning and laying of sewerage system including const. of intercepting chamber in village Sakras and other works contingent thereto` { 04/09/2019 - 03/09/2020 } 6.49 Narender Singh Contractor 28/08/2019
133 Nuh (P) PHED No. 1 Sakras- Prov. and laying of Sew. system in Sakras `Designing and const. commissioning of 3 MLD STP based on SBR tech. with 3 MLD MPS followed by chlorination with all civil structure i.e. SQ BW etc. Elect. Mech. Instru. including OandM 5 yrs after 12 month defect liability period after 3 month trial run { 10/08/2021 - 09/08/2022 } 5.32 Narender Singh Contractor 06/08/2021
134 Palwal PHED No. 1 Aug. W/S Sch in Quality Aff 84 No. vills. Prov. laying, jointing, testing and comm. of PCC pipe 800 mm i/d/ 700 mm i/d rising main from MBS Mohna and MBS Dudhola and laying, jointing, testing and comm. D.I. pipe line to connect IBS Mandkol and IBS Dudhola, const. of steel truss bridge, crossing of RW and NH with 3 mths trial run period, 5yrs mtc. inc. 1yr defect liability period and all other works contingent thereto`.(At Risk and Cost) { 11/11/2018 - 10/11/2019 } 26.51 Concrete Udyog Jhansi M/S 02/11/2018
135 Palwal PHED No. 1 Augmentation Drinking Water Supply Scheme in QualityAffected 84 No. villages of Prithla and Palwal constructionof Ranney Well and Deep Tubewell in village Mohna.`Construction of 4 Nos.Intermediate Boosting Station each in village Dudhola, Mandkol, Prithla andBhanakpur, laying of rising main from each intermediate boosting station tovillage SBS, construction of 39 No. SBS in various villages, crossing ofrailway line and National Highway etc. { 15/06/2020 - 14/06/2022 } 22.61 Sh. Hamid Hussain 29/05/2020
136 Palwal PHED No. 1 Aug. W/S Scheme in Quality Affected 84 No. vills. `Prov. laying, jointing, testing and comm. of PCC pipe 800 mm i/d/ 700 mm i/d rising main from MBS Mohna and MBS Dudhola and laying, jointing, testing and comm. D.I. pipe line to connect IBS Mandkol and IBS Dudhola, const. of steel truss bridge, crossing of RW and NH with 3 mths trial run period, 5 year mtc. inc. 1 year defect liability period and all other works contingent thereto`. { 01/09/2017 - 31/08/2018 } 25.18 M/S Vichitra Prestressed Concrete Udyog Pvt. Ltd. 29/08/2017
137 Palwal PHED No. 1 Aug.drinking Water Supply Scheme in quality affected 84 No villages of Prithla and Palwal block of Distt.Palwal and Ballabgarh block of Distt.Faridabad from Yamuna flood Plan by Cons. of Ranneywell and deep Tubewell in village Mohna. Const. of 3 Nos IBS each in village Dhatir, Kairaka and Ratipur. Laying of rising main from each IBS to village SBS, const. of 33 Nos SBS in various villages, providing independent feeder for IBS with 5 years operation and mtc including 1 year defected liability period after 3 months trail run period and all other works contingent thereto { 21/04/2018 - 20/04/2019 } 13.12 Nafe Singh Contractor Narwana 10/04/2018
138 Palwal PHED No. 1 Aug. Drinking W/S sch. quality affected 84 Nos. villages of Palwal, Pirthla and Ballabgarh Block. `Const. of 2 no. ranneywell, installation of 2no. T/W, const. of MBS in village Mohna and pumping machinery, independent feeder for ranneywell and MBS including all crossing with 3 months trail run period, 5 yrs OandM incl. 1 year defect liability period for and all other works contigent thereto`. { 01/08/2017 - 31/01/2019 } 28.68 Advanced Infratech Pvt. Ltd 27/07/2017
139 Palwal PHED No. 1 Aug.drinking W/S Sch.in quality affected 84 No villages of Prithla, Palwal and Ballabgarh block of Distt.Palwal andFaridabad`-Const. of MBS in vill.Dudhola. Laying rising main from MBS Dudhola to 5 Nos IBS in various vill.Const.of 1 No.steel truss Bridge on Gaunchi drain with 3 months trial run period, 5 years OandM including 1 year defect liability period and all other works contingent thereto`. { 01/11/2017 - 30/04/2019 } 5.53 Sh. Jaibir Singh 27/10/2017
140 Palwal PHED No. 1 Aug.drinking W/S Sch. in qlty affected 84No vills of Prithla and Palwal block of Distt.Palwal and Ballabgarh of Distt.FBD from Yamuna flood Plan.Const. of 4 Nos IBS each in village Duhdola,Prithla,Mandkol and Bhanakpur. Lay of rising main from each IBS to vill SBS, const of 39 Nos SBS in vari vills, prov. ind. feeder for IBS with 5yrs OandM incl. 1yr defected liability prd after 3 months trail run period and all other works contingent thereto { 07/07/2018 - 06/07/2019 } 18.79 Rajesh Kumar Contractor 27/06/2018
141 Palwal PHED No. 3 Providing Sewerage facilities in village Aurangabad, District Palwal under Mahagram Yojana/NABARD, “Design, construction, supply, erection, testing and Commissioning of 2.50 MLD MPS Comprising of receiving chamber, Mechanical Coarse Screen, Raw Effluent Sump cum Pump House, Pumping Machinery and all other works contingent thereto. { 28/01/2022 - 27/01/2023 } 5.42 Rajesh Kumar Contractor 19/01/2022
142 Palwal PHED No. 3 Providing Sewerage facilities in village Deeghot, District Palwal under Mahagram Yojana/NABARD, “Design, construction, supply, erection, testing and Commissioning of 2.50 MLD MPS Comprising of receiving chamber, Mechanical Coarse Screen, Raw Effluent Sump cum Pump House, Pumping Machinery, Mechanical Fine Screens, Detrius Chamber, 2.50 MLO STP and all other works contingent thereto. { 28/01/2022 - 27/01/2023 } 5.42 Rajesh Kumar Contractor 19/01/2022
143 Palwal PHED No. 3 khambi:- Supplementary estimate for providing sewerage system in village khambi, Tehsil Hodal and District Palwal (under Mahagram Yojna) { 22/09/2023 - 19/05/2024 } 6.48 Lakhan constructions 15/09/2023
144 Palwal PHED No. 3 Providing Sewerage system in Bedha Patti and Garhi Patti and construction of MPS of 4.5 MLD capacity and STP of 1.5 MLD capacity on SBR technology including all works contingent thereto in Bedha Patti of Hodal town (Including Operation and Maintenance of new MPS and STP for a period 3 months during { 22/09/2023 - 21/09/2024 } 8.35 Lakhan constructions 15/09/2023
145 Palwal PHED No. 3 Providing Sewerage facilities in village Bhiduki, District Palwal under NABARD, “Design, Construction, Supply, Erection, Testing and Commissioning of 2.50 MLD MPS Comprising of Receiving Chamber, Mechanical Coarse Screen, Raw Effluent Sump cum Pump House, Pumping Machinery and all other works contingent thereto. { 20/05/2022 - 19/05/2023 } 6.3 Jaiveer Singh Contractor 04/05/2022
146 Palwal PHED No. 3 Providing Sewerage facilities in village Sondhad Distt. Palwal under NABARD Designing, Construction, Commissioning 2.50 MLD STP on SBR Technology and all other works contingent thereto. { 20/05/2022 - 19/05/2023 } 6.06 Jaiveer Singh Contractor 09/05/2022
147 Palwal PHED No. 3 Compensation for Acquired Land for Rural and Urban W/S and Sewerage Works (Hodal STP)(Land Compensation) { 24/05/2021 - 23/08/2021 } 6.57 Jasveer singh Contractor 23/05/2021
148 Palwal PHED No. 3 `Laying of 200 mm i/d, 250 mm i/d, 300 mm i/d SW pipe sewer line, construction of MH Chambers, Construction of Screening chambers, Crossing of Road, Raising of existing MH`s, renovation of Damage W/S { 28/04/2023 - 27/04/2024 } 5.94 Jasveer singh Contractor 24/04/2023
149 Palwal PHED No. 3 Detailed Project Report Providing Sewerage Facilities and Sewage Treatment Plant at village Deeghot, District Palwal (Under Mahagram Yojna). { 13/11/2020 - 12/05/2022 } 8.51 Jasveer singh Contractor 28/10/2020
150 Palwal PHED No. 3 Detailed Project Report Providing Sewerage Facilities at village Aurangabad, District Palwal(Under Mahagram Yojna) Construction of 2 No. IPS consisting with RCC collecting tank, pump chamber, boundary wall, supplying, erection, testing and Commissioning sewage submersible pumping set of 600/800 LPM and all other works contingent thereto. { 16/01/2021 - 15/07/2022 } 7.63 Jasveer singh Contractor 06/01/2021
151 Palwal PHED No. 3 Detailed Project Report for Providing Sewerage Facilities at village Sondhad, District Palwal(Under Mahagram Yojna).Construction of 2 No. IPS consisting with RCC collecting tank, pump chamber, boundary wall, supplying, erection, testing and Commissioning sewage submersible 2 No. pumping set of 700/500 LPM, 15 mtr Head, providing, laying, jointing, cutting, testing of 200 mm i/d DI Rising Main from and all other works contingent thereto. { 28/12/2020 - 27/06/2022 } 6.45 Jasveer singh Contractor 17/12/2020
152 Palwal PHED No. 3 Up gradation and commissioning after conversion of existing 9 MLD Capacity sewage Treatment based on Moving Bed Biological Reactor Technology (Attached growth process) i.e completion of tertiary treatment plant at Hodal Town Distt. Palwal. { 27/09/2023 - 21/09/2024 } 8.89 RAJEEV KUMAR GOEL CONTRACTORS 20/09/2023
153 Palwal PHED No. 3 Palwal Town:-Detailed Project Report for Providing Strom Water Drainage System,` Construction of RCC Open Storm Water Drains in Palwal Town, Under PHED Division No. 3 Palwal Distt. Palwal. Estimate Cost:-3831.28 lacs `DNIT for Providing Strom Water Drainage System,` Construction of RCC Open Storm W { 16/03/2024 - 12/10/2024 } 29.84 Jai Shree Balaji Const Co. Panipat 15/03/2024
154 Palwal PHED No. 3 Detailed Project Report Providing Sewerage Facilities and Sewage Treatment Plant at village Kambhi, District Palwal(Under Mahagram Yojna). { 13/11/2020 - 12/05/2022 } 6.53 RAJESH KADIYAN 28/10/2020
155 Palwal PHED No. 3 DPR for providing sewerage facility in village Bhiduki, Tehsil Hodel, Distt Palwal (Under Mahagram Yojna) Construction of 2 No. IPS consisting with RCC collecting tank, pump chamber, boundary wall, supplying, erection, testing and Commissioning sewage submersible pumping set of 1000/1500 LPM, 15 mtr Head, providing, laying, jointing, cutting and testing of 200 mm to 500 mm i/d SWP sewer line and all other works contingent thereto. { 21/01/2021 - 20/07/2022 } 7.19 RAJESH KADIYAN 18/01/2021
156 Panipat PHED No. 1 Madlauda `Providing Sewerage system in village Madlauda Distt. Pnipat { 21/11/2022 - 20/05/2024 } 20.44 Jai Shree Balaji Const Co. Panipat 20/10/2022
157 Panipat PHED No. 2 Up gradation and commissioning after conversion of existing 5 MLD Capacity sewage Treatment and completion of tertiary treatment plant at Samalkha Town Distt. Panipat { 01/11/2022 - 31/10/2023 } 6.8 RAJEEV KUMAR GOEL CONTRACTORS 14/10/2022
158 Panipat PHED No. 2 PART-B- Providing sewerage system in village Chulkana Distt. Panipat. Laying of 21.44 km sewerage network of different sizes in village Chulkana, Distt. Panipat. Operation and maintenance of Sewerage Scheme for 5 years { 24/12/2020 - 23/06/2022 } 6.67 Jasveer singh Contractor 24/12/2020
159 Panipat PHED No. 2 PART-A- Sewerage System- Providing sewerage system in village Bapoli Distt. Panipat “Laying of 25.64 km sewerage network of different sizes in village Bapoli, Distt. Panipat. Operation and maintenance of Sewerage Scheme for 5 years after defect liability period of 1 year after trial run period of 3 months { 20/11/2020 - 19/05/2022 } 5.71 RAJESH KADIYAN 20/11/2020
160 Panipat PHED No. 2 Detailed Project Report For Shayama Prasad Mukherji Rurban Mission (Sewah Cluster) 9 Villages, District Panipat, “Providing, Installation of 6 tube wells upto 350m BGL, Construction of 6 tube well Chambers, boundry wall, laying of internal Distribution Pipe Lines, Supply, Erection, testing and commissioning of 6 submersible pumping sets for tube wells.... { 28/05/2020 - 27/11/2021 } 5.28 Nar singh Goel 21/05/2020
161 Panipat PHED No. 2 Dadlana STP- Design, construction, erection, testing, commissioning of 2.50 MLD Sewage Treatment Plant based on Sequential Batch ReactorTechnology complete in village Dadlana Distt. Panipat { 27/12/2021 - 26/06/2023 } 5.78 HITECH ENVIRO ENGINEERS AND CONSULTANTS PVT. LTD 21/12/2021
162 Panipat PHED No. 2 Part – A Water Supply Augmentation of water supply scheme by changing old pipe lines in village Sewah Distt. Panipat Part – B Sewerage System Providing sewerage system in village Sewah Distt. panipat { 11/09/2019 - 10/03/2021 } 8.62 H S Construction Company 11/09/2019
163 Punhana PHED P/F pumping machinery, Providing and fixing of DG set, transformer at Main Boosting Station Uttawar, laying, jointing, testing and commissioning of 800 mm i/d DI Rising Main from MBS Sultanpur to MBS Uttawar, Construction of 07 no. steel truss bridge for various spans for crossing of Agra Canal, crossing of railway line, crossing of national highway with 3 months trial run period after commissioing { 12/02/2022 - 11/02/2023 } 17.58 Chahar Construction Co. 02/02/2022
164 Punhana PHED Providing and fixing of pumping machinery, providing and fixing of DG set, transformer at Main Boosting Station Bhadas, laying, jointing, testing and commissioning of Main 800 mm i/d DI rising main from MBS Kot Bahin to MBS Bhadas and 300, 350 and 400 mm i/d DI Sub Rising Main from MBS Bhadas to IBS Umra, Jalalpur, Bhadas, Nagina and Khanpur Ghati (upto Junction point) { 18/02/2022 - 17/02/2023 } 14.92 Chahar Construction Co. 10/02/2022
165 Punhana PHED Construction of 1 No. ranney well, installation of 8 No. t/well const. of main boosting station in village Sultanpur and pumping machinery, independent feeder for ranney well and MBS Sultanpur { 25/07/2021 - 24/01/2023 } 31.28 Advanced Infratech Pvt. Ltd 07/07/2021
166 Punhana PHED Construction of 2 No. Intermediate Boosting Station each in village Bhadas and Khanpur Ghati , laying of rising main from each intermediate boosting station to village SBS, Providing and fixing pumping machinery, Construction of approach path, Staff Quarter, Field Office, Construction of Boundary wall, construction of 14 No. SBS in various villages with 3 months trial run period, 5 years Operation and Maintenance after 1 year { 07/05/2022 - 06/05/2023 } 10.65 Shree Balaji Builders 02/05/2022
167 Punhana PHED Construction of 2 No. Intermediate Boosting Station each in village Umra and Jalalpur , laying of rising main from each intermediate boosting station to village SBS, Providing and fixing pumping machinery, Construciton of approach path, Staff Quarter, Field Office, Construciton of Boundary wall, construction of 07 No. SBS in various villages with 3 months trial run period, 5 years Operation and Maintenance { 07/05/2022 - 06/05/2023 } 8.28 Shree Balaji Builders 02/05/2022
168 Rewari PHED No. 1 Ibrahimpur, providing canal based water works gr. of 17 No. villages { 01/11/2018 - 30/10/2019 } 11.7 Jai Shree Balaji Const Co. Panipat 29/10/2018
169 Rohtak PHED No. 1 Titoli:- Estimate for Providing Functional Household Tap Connection (FHTC), laying of distribution pipe line and renovation of existing water supply scheme in Village Titoli District Rohtak (Under JJM). { 28/07/2023 - 27/07/2024 } 7.29 Lalit Bhardwaj 13/07/2023
170 Rohtak PHED No. 2 Augmentation of Water Supply Scheme Nindana, “Design, testing , commissioning of automated PLC controlled SCADA based water purfication plant of 3 MLD capacity Part-B Sewerage system in Nindana ` construction of 2 no. intermediate pumping station consisting of 2 no. collecting tanks including screening chamber,inlet box, Operation and mtc. of 5 years for water supply including WTP`s and sewerage after defect liability period for 12 months { 09/09/2019 - 08/03/2021 } 10.62 Kulbir Singh 05/09/2019
171 Rohtak PHED No. 2 Nindana- construction of 2 no. intermediate pumping station consisting of 2 no. collecting tanks including screening chamber,inlet box, pump chambers over the collecting tank, supplying and installation of pumping machinery at the intermediate pumping station, supply , laying jointing and testing of stone ware pipes of size from 100 mm to 400 mm , construction of brick masonry manhole chamber, providing SFRC manhole covers and frames { 09/09/2019 - 08/03/2021 } 7.3 Kulbir Singh 05/09/2019
172 Rohtak PHED No. 2 KHARKHARA (BHIKHLAN and CHHAJAN): ESTIMATE FOR AUGMENTATION OF WATER SUPPLY SCHEME BY PROVIDING 2ND WATER WORKS, FUNCTIONAL HOUSEHOLD TAP CONNECTIONS and LAYING THE BALANCE PIPE LINES IN VILLAGE DISTT. ROHTAK (UNDER JJM) Construction of Raw water pumping station and 2nd. water works comprising desi { 10/11/2023 - 09/11/2024 } 5.9 Jaiveer Singh Contractor 16/10/2023
173 Rohtak PHED No. 3 Laying of new 200mm i/d to 300mm i/d SW Sewer lines and 350mm i/d, 450mm i/d, 600mm RCC NP3 Sewer lines, construction of manholes, Restoration of water / sewer connection to be damaged during the course of execution of work , Pumping Machinery and Construction of IPS for Sri Nagar Colony. { 29/09/2023 - 28/09/2024 } 6.09 M/s Shri Balaji Builders. house No. 858-P Sector 33 22/09/2023
174 Rohtak PHED No. 3 Rohtak Town Construction of new Disposal at Gurunanakpura and laying of HDPE 900 mm Rising Main pipe line from Gurunanak pura Disposal to Jasia Drain Chamaria road Rohtak { 30/05/2023 - 29/05/2024 } 23.7 M/s Shri Balaji Builders. house No. 858-P Sector 33 23/05/2023
175 Rohtak PHED No. 3 Repair / Strengthening of existing 1600mm i/d sewer line by using CIPP (Cured in Place Pipe) Technology from front of Bagh Wali Gali to 2nd Storm Water Disposal Jhajjar Rohtak Town and all other works contingent thereto { 01/06/2021 - 31/08/2021 } 5.19 V N ENGINEERING COMPANY 26/05/2021
176 Rohtak PHED No. 3 Rohtak Town CIPP lining of 1600 mm id pipe point A to B { 18/05/2023 - 17/05/2024 } 8.03 V N ENGINEERING COMPANY 11/05/2023
177 Sirsa PHED No. 1 Designing, Constructing, Testing, Commissioning of 12.50 MLD Sewage Treatment Plant based on Sequential Batch Reactor Technology comprising of Inlet Chamber, Staff Quarter trial Run period of 3 months, 12 months defect liability period and five years Operation andMaintenance thereafter at village Nattar, Sirsa Town, Haryana { 15/02/2023 - 14/08/2024 } 11.94 M/s Sourabh Constructions Private Limited 10/02/2023
178 Sirsa PHED No. 1 “Designing, Const., Testing, Comm. of 20 MLD STP based on SBR Technology comprising of Inlet Chamber,Raising of B/Wall, Approach Roads, Landscaping, MCC Panel Room, CCTV Cameras and all other Elect., mech., instr. works on PLC and SCADA System contingent thereto complete in all respects on Turn Key basis including trial period of 3 months, 12 months defect liability period and five years O and M thereafter at Kelnia Road, Sirsa Town, Haryana. { 31/10/2017 - 30/04/2019 } 14.8 M/s Vardhman Builders 26/10/2017
179 Sirsa PHED No. 1 Const. of 1 No. Collecting Tank, Const. of PC, 630 mm o/d HDPE pipe, installation of DG set, Pumping Machinery, etc. { 08/01/2020 - 07/08/2021 } 15.14 M/s Durga Const. Company 02/01/2020
180 Sirsa PHED No. 1 Aug Sew Sch Sirsa Town Design const erection testing and comm of 15 MLD STP complete in all respects including OandM at kelnia road sirsa { 26/07/2016 - 26/10/2016 } 9.29 Girdhari Lal Aggarwal Contractor Pvt. Ltd. 25/08/2010
181 Sirsa PHED No. 1 Ellenabad Town:- Aug. Water Supply Scheme Ellenabad Town. `Construction of S/S Tanks, Repair of Existing Water Works Structures and Laying of New Water Carrier (800mm i/d D.I. Rising Main) From Southern Ghaggar Canal to existing Water Works`. { 04/09/2023 - 17/12/2026 } 5.88 Vikash Badesra Contt. 28/08/2023
182 Sirsa PHED No. 1 Laying of Sewer Line, P/M, B/ Wall,C.C. Road and Path,- Repair of Existing Structures, Const. of S.V Hodies and Connection etc,(IPS Auto Market) P/M, Const.of P.C of Size 3.05x3.66 mtr.,Const. of B/Wall, Laying of 280 mm i/d HDPE Rising Main 1200 mtr.,RCC Collecting Tank of Size 7.62x5.18 mtr. etc, { 15/09/2023 - 03/03/2026 } 6.75 Krishan Kumar Aggarwal 08/09/2023
183 Sirsa PHED No. 1 Up gradation and comm. after conversion of existing 7.5 MLD STP Ellenabad { 15/01/2019 - 14/04/2020 } 5.4 Anand Kumar JhoJho Khurd 08/01/2019
184 Sirsa PHED No. 1 Up gradation and commissioning 15 MLD STP at Kelnia. { 15/01/2019 - 14/04/2020 } 8.94 Anand Kumar JhoJho Khurd 09/01/2019
185 Sirsa PHED No. 2 Laying of D.I. Rising Main from Canal to Main Water Works, Construction of One No. Pump Chamber of size 10`x12`-1 No., Generator Set 500 KVA-1 No. with Platform - 1 No., Transformer with Plateform - 1 No., Electric Meter Room-1 No., reconstruction / repairing of Boundary Wall, C.C. Road and Plinth Protection, Laying of 300mm dia D.I. Pipe Line at Mini-Sectt Water Works area and all other works contingent thereto { 10/12/2019 - 09/06/2021 } 8.5 Jai Parkash Garg 27/11/2019
186 Sirsa PHED No. 2 Designing, Const, Testing, Commissioning, O and M for 5 years after defect liability period of 12 months after 3 months successful trial run of Channel, 2 Nos. S/S Tanks, 25MLD Automated WTP , 1 No. CWT, SCADA system and all other electrical, mechanical, instrumentation and other works contingent there to complete in all respects on Turnkey basis at Village Panjuana, Sirsa Town, Haryana.” { 07/12/2017 - 06/03/2019 } 23.9 M/S Ashok Kumar Jain, Govt. Contractor 01/12/2017
187 Sirsa PHED No. 2 CHAUTALA - Augmentation of water supply scheme for village Chautala Distt. Sirsa. “Old Water Works: - Const. of RCC NP3 pipe channel, 1 No. RCC HLT, 1 No. Pump Chamber, RCC S/S Well for R/W and C/W, Renovation of existing structures, 2nd Water Worksand B/Stns :- Const. of RCC NP3 pipe channel, 2 No. Brick lining S/S Tank, RCC S/S Well for R/W and C/W, 4.00 MLD WTP, 2 No. RCC CWT, 1 No. Pump chamber ETC. { 15/12/2022 - 14/12/2024 } 17.89 M/S Ashok Kumar Jain, Govt. Contractor 29/11/2022
188 Sirsa PHED No. 2 Providing sewerage system in village Chautala Distt. Sirsa. “Design, Construction , Erection , Testing and Commissioning of Automatic and PLC controlled with SCADA for 3.50 MLD Sewage Treatment Plant based on Sequential Batch Reactor technology, construction of 10.5 MLD Main Pumping station with automatic and PLC controlled with SCADA, complete in all respect in village Chautala Distt. Mandi Dabwali. { 15/12/2022 - 14/12/2024 } 45 M/S Ashok Kumar Jain, Govt. Contractor 29/11/2022
189 Siwani PHED Augmentation of water supply scheme Loharu Town by Providing canal based water works, Distt. Bhiwani, { 21/09/2020 - 20/03/2022 } 21.46 Shree Balaji Builders 11/09/2020
190 Siwani PHED Barwa vill Aug. WS scheme, `Const. of 1 RW P/Station, 1 WW, const. testing and comm.of 2.50 MLD automated PLC based WTP, SandS tank, CWT, PC, B/Wall, CC road, RW and CW RM lines, laying of dist. and prov. FHTC, supply, erection and comm. of RW and CW pumping sets, electric transformers and DG sets of required capacity, OandM for 12 M during def. liab.period after trail run of 3 months and 5Y thereafter and all other works conti. thereto { 01/05/2022 - 30/04/2024 } 9.39 Jasveer singh Contractor 13/04/2022
191 Siwani PHED Barwa Part B- Sewerage system- Providing sewerage facilities and STP at village Barwa, Distt. Bhiwani, “laying of pipe sewerage network of different sizes and OandM for 12 months during defect liability period after trial run of 3 months and 5 years thereafter and all other works contingent thereto” { 01/05/2022 - 30/04/2024 } 7.26 Jasveer singh Contractor 13/04/2022
192 Sohna PHED Prov. sewerage scheme and const. of Sewerage Treatement Plant for H.Mandi Town of Distt. Gurugram `Designing, const., erection, testing and commissioning of automatic and PLC controlled with SCADA 5.50 MLD main P/station, Rising main upto STP, const. of automatic and PLC controlled with SCADA 5.50 MLD Sewerage Treatment Plant based on Sequential Batch Reactor (SBR) Technology, including 700mm i/d RCC pipe effluent channel.(under State Plan.) { 09/12/2016 - 09/06/2018 } 7.5 SCC EICPL (JV M/s SHiv Const. Co. and M/s Enviro Infra Engineer Co.Ltd. 2120 U.E Jind) 05/12/2016
193 Sohna PHED Bhora Kalan- DPR for sewerage facilities and construction of STP (Mahagram Yojna)Bhora Kalan- Providing and installation of 17 No. tubewell at village Bhora Kalan including 2 No. Dhanies Tehsil Pataudi { 25/08/2022 - 23/08/2024 } 7.73 Jai Shree Balaji Const Co. Panipat 17/08/2022
194 Sohna PHED Bhora Kalan- Providing and installation of 17 No. tubewell at village Bhora Kalan including 2 No. Dhanies Tehsil Pataudi (Mahagram Yojna { 25/08/2022 - 24/08/2024 } 6.88 Jai Shree Balaji Const Co. Panipat 17/08/2022
195 Sohna PHED Aug. Drinking W/S Scheme in Fluoride Affected 23 No. villages of Sohna Distt. Gurgram. `Supply and Erection of P/M at MBS Dudhola, laying of rising main from MBS Dudhola to IBS Ghangola, construction of IBS at Ghanghola, laying of sub rising main from IBS Ghanghola to village SBS, construction of 23 Nos. (Volume- I-II) { 27/07/2018 - 26/07/2019 } 7.19 Rajender Contractor, Punhana (Mewat) 13/07/2018
196 Sohna PHED Sohna Town and Rozeka Meo Aug. W/S scheme Design, const. andcommissioning of raw water pumping station at Budhera andrising main of PSC pipe line on turenkey basis comprasing ofinnelt channel, 2 no. S/S tank pump house, pumping machinery , including electrilcal, mechnical instrumentation works .Boundarywall, stff qtr,PSC pipe line, , surge control devices op. and maintaince for 3 years after defect liablity period of1 year { 01/02/2016 - 01/05/2016 } 27.39 Jain Const.Co.M/s 03/12/2009
197 Sohna PHED Design, Const.,erection , testing and commissioning , operation and Maintenance for 3 year after defect liability period of 12 months of canel based W/S Sch. for Sohna Town comprising of 2 Nos. storage and laying and testing of 600mm i/d, 450mm i/d , 300mm i/d DI Pipe Raising main upto Sohna Town and Rojka Meo , and all other works contingent thereto.(under NCRPB) { 01/02/2016 - 01/05/2016 } 18.81 Jain Cons. Company M/S 31/08/2009
198 Sohna PHED Providing sewerage scheme and Treatment Plant for Haily Mandi Town. “Providing and laying 200mm, 250mm, 300mm, 350mm, 400mm, S.W. Pipe sewer and 450 mm i/d and 600mm i/d RCC NP-3 pipe sewer, construction of manhole, and all other works contingent thereto at Haily Mandi Town, District Gurgaon” (Under State Plan) { 12/12/2015 - 12/12/2016 } 8.9 Rakesh Yadav 03/12/2015
199 Sohna PHED Design and Construction of Pumping Station, 1 No Collecting Tank, RCC Screening C/Pump Chamber, B.Wall, Providing and fixing Non Clog Sewage Submersible Pump Sets , Providing, Laying, Jointing, Cutting, Testing, Commissioning 200 mm, 250 mm, 300 mm, 400 mm S.W. Pipe sewer, Construction of in balance approved colonies in Sohna Town Distt. Gurugram, Haryana.`` (UNDER NCRPB) { 16/07/2018 - 15/10/2019 } 10.47 Jain Construction Co. Hisar M/S 02/07/2018
200 Sonipat PHED No. 2 Aug of Sewrage and STP under NRCP At Sonipat Town Const. erection testing commissioning operation and maintaenance for 10 years if after defect liabililty of one year of proposed main sewerage pumping station. { 01/09/2013 - 31/05/2015 } 38 M/s H.L. Handa and Company 16/08/2013
201 Sonipat PHED No. 2 Aug.of sewerage Treatment plant work under NRCP at Sonipat `construction of New 25 MLD STP and repair of 30 MLD STP { 01/09/2013 - 31/05/2015 } 38 M/s H.L. Handa and Company 16/08/2013
202 Sonipat PHED No. 2 Providing and laying of sewer work under NRCP `Laying of 800mm i/d RCC NP-3 from point 25 to 10N (1370Mtr) and 100mm id. RCC Pipe from point No. 10 N to 9N (2598 Mtr) { 15/01/2013 - 14/10/2013 } 5.06 Jai Shree Balaji Const. Co. M/S 02/01/2013
203 Sonipat PHED No. 2 Sewerage Work in Sonipat Town under NRCD `Provding and laying of 1100mm and 1400mm i/d RCC NP4 pipe sewer const of RCC Manhole chamber and all otehr work contingent thereto { 05/01/2013 - 04/02/2014 } 8.97 Jagdish Dahiya 01/01/2013
204 Sonipat PHED No. 2 Acquistion of land for 2nd STP near Jamalpur Khurd `Pending payment of the land owners` { 17/06/2016 - 16/07/2016 } 8 ..VIKAS 15/06/2016
205 Sonipat PHED No. 2 upgradation and renovation of existing 7 MLD STP based on MBBR Technolonigy as per revised sewage / effluent discharge standerd with all accessries { 20/04/2022 - 19/04/2023 } 5.63 RAJEEV KUMAR GOEL CONTRACTORS 12/04/2022
206 Tohana PHED Samain- Aug and Repair of existing water works and construction of 2nd canal based water works at Samain and Providing Functional Household Tap Connection ( FHTC) to households in village Samain Tehsil Tohana Distt. Fatehabad ( Under Jal Jeevan Mission) { 28/08/2023 - 19/04/2025 } 6.16 Vinod Kumar Singal 16/08/2023
207 Tohana PHED Ratia Town - Providing Independent Canal Based Water Works At Ratia Tow Distt Fatehabad { 14/12/2023 - 18/12/2026 } 46.89 M/s Shri Balaji Builders. house No. 858-P Sector 33 04/12/2023
208 Tohana PHED Augumentation of Water Supply Scheme Tohana Town and Laying of water supply pipe line in left out area and replacement of existing AC/PVC pipelineto DI Water Supply pipeline at Tohana Town Tehsil Tohana District Fatehabad. { 27/11/2023 - 28/05/2025 } 10.09 OmParkash Contt. Berla 17/11/2023
209 Tohana PHED Providing sewerage scheme and Construction of Sewage Treatment Plant including Operation and Maintenance for 12 months during defect liability period after trail run of 3 months and Five years thereafter at Tohana Town of District Fatehabad ” { 15/10/2020 - 14/04/2022 } 5.79 M/s Shiv Construction Company Jind 25/09/2020
210 Tosham PHED Up-grading of existing Sewage Treatment Plant (STP) of 4.50 MLD capacity based on Moving Bed Bio Reactor (MBBR) technology located at Kheri Doulatpur Road, Bawani Khera town, District Bhiwani { 25/05/2022 - 24/11/2023 } 6 HITECH ENVIRO ENGINEERS AND CONSULTANTS PVT. LTD 24/05/2022
211 Yamuna Nagar PHED No. 1 Construction of Sewerage Treatment Plant and Sewerage Network in Saraswati Nagar (Mustafabad) Distt. Yamuna Nagar (Hon’ble C.M. Announcement). { 26/09/2017 - 25/09/2019 } 5.46 Inderjeet Singh Contractor 26/09/2017
212 Yamuna Nagar PHED No. 1 DPR for designing of rising main from 20MLD STP MPS at Badhi Majra and 24MLD STP at Parwalon at Yamuna Nagar. `Design, construction, erection, testing and commissioning of rising main from 20 (10 plus 10) MLD STP at Badhri Majra nd 24MLD STP Parwalon, Yamuna Nagar, Pumping Station and Rising Main for safe disposal in River Yamuna near Udhri village, Yamuna Nagar and including operation and maintenance for 5 years. { 30/05/2019 - 28/05/2020 } 18.24 Jain Irrigation Systems Limited 27/05/2019
213 Yamuna Nagar PHED No. 2 Prov.Sew. facilities to 7 Nos. villages i.e. Aurangabad, Ishopur, Patashgarh, Mandebri, Panjeton Ka Majra, Heri Rangran, Sasoli in MC Y.Nagar (Under CM Announcement No. 10054), SW and RCC NP-3 Pipe Sewer of size 200mm, 250mm, 300mm, 400mm, 500mm, 600mm and 700mm in village Sasoli, Kheri Rangran, Panjeton Ka Majra and Mandebari, { 25/07/2017 - 24/07/2019 } 6.14 Sh. Anil Deswal 11/07/2017
214 Yamuna Nagar PHED No. 2 Design, Constm., erection, comm. of 10 MLD STP based on SBR Tech. at Badhi Majra Yamuna Nagar (Kapil Engg. Co. Rohtak) { 09/03/2018 - 08/09/2019 } 9.22 Kapil Engineering Company 01/03/2018
215 Yamuna Nagar PHED No. 2 Yamuna Nagar Town, Estimate for Damage/Replace Sewer and Laying of 800 mm i/d RCC NP3 Sewer Line and Construction of manhole near WJC, District Yamuna Nagar. “Laying of 200 mm, 300 mm i/d SW sewer line, 800mm i/d RCC NP 3 Sewer Line and 400mm o/d and 560mm O/d HDPE PE100 PN6 sewer line by trenchless { 11/08/2023 - 07/02/2024 } 5 Shri Anil Kumar Contractor 08/08/2023
×