Public Health Engineering Department, Haryana

जन स्वास्थ्य अभियांत्रिकी विभाग, हरियाणा
Public Health Engineering Department, Haryana


" Tarrif Structure/ Terms & Conditions "
Back to Home Page

HARYANA GOVERNMENT

URBAN DEVELOPMENT DEPARTMENT

Order

       

No. 17/6/2002-5C-I. - In exercise of the powers conferred by Clause (xv) of Sub Section (1) of Section-70 read with section 277-A of the Haryana Municipal Act, 1973 (24 of 1973), and in suppression of Haryana Government Urban Development Department Notification No. 17/6/2002-5C-I dated 10th November , 2006, the Governor of Haryana hereby orders that a committee may, from time to time, for the purpose of the said Act, impose the following fees in the whole or any part of the municipality and also entrust the function, duties and responsibilities of a committee relating to water supply and sewerage to the Public Works Department (Public Health), namely: -

     

Sr. No. Type of Connection Water Charges
Metered Supply Un-Metered Supply Waste Water Disposal Charges
1. Domestic Rs. 1.00 Per Kilo Litre Rs. 48 Per Month 25% of Water Charges
2. Industrial/ Commercial/ Institutional Rs. 4.00 Per Kilo Litre ---- 25% of Water Charges
Note:-

  1. Minimum monthly bill @ Rs. 48/- per connection for domestic and @ Rs. 100/- per connection for institutional/Industrial/commercial /irrespective of the consumption shall be charged.
  2. For the water supply connection in the villages falling under the Municipal area and where Public Health Engineering Department has agreed to provide services to villages then the water and sewerage rates of domestic/commercial/industrial water connections shall be charged at the same rates as mentioned above. 
  3. No water connection with ferrule more than 10 millimetre dia shall be allowed.
  4. Commercial/Industrial/Institutional waste water shall be charged @ Rs. 250 per kilolitre of waste water generated by use of water from their own sources (the waste water discharged in sewerage system shall be taken @ 70% of the total water consumed by the consumer from their own sources).

Other Terms and Conditions:-

  1. The water and sewer connection fee of Rs. 1000/- and Rs. 500/- respectively shall be charged for domestic premises.
  2. The water and sewer connection fee of Rs. 2000/-, Rs. 1000/- and Rs. 1000/- respectively shall be charged for Industrial, Commercial and Institutional premises. 
  3. No connection with ferrule size than 10 millimetre shall be allowed. Any existing connection with more than 10 millimetre size ferrule shall be reduced as per the provision mentioned above or it will be got converted into a metered connection otherwise. 
  4. No un-metered water supply connection shall be allowed in the commercial, institutional or industrial restablishment in future. All the existing water supply un-metered connections shall be converted into metered ones by the occupants in a period of three months from the date of order otherwise the rate of bill charged shall be minimum of Rs. 1000/- per month or as assessed by the concerned Executive Engineer of the Public Health Engineering Department. 
  5. If any part of the house is used for purposes other than the domestic then the rates for whole of the water supply shall be charged at the Commercial/Industrial/Institutional rates. 
  6. a) The water and sewerage/waste water user charges shall be paid by the consumers either by depositing the billed amount in cash or by bank draft or by money order within thirty days from the issue of the bill.                                                                                                                                         b) Where the water and sewerage user charges amount is not paid within the due date, then one time surcharge/penalty @ 10% shall be levied on current bill only and not on total amount of bill in subsequent bill.                                                                                                                                        c) In case of non-payment of complete amount of water and sewerage user charges within six months from the due date of payment of first pending bill, the water/sewer connection of such consumers may be disconnected.
  7. The department shall supply the water at ground level only. 
  8. A water supply or sewer connection shall be charged at commercial, institutional or industrial rates as deemed fit, if any related activity even in residential areas is being undertaken by the occupant. However, levy of commercial, institutional or industrial rates for the water supply or sewer connection shall but confer any right to the occupant to get the advantage of being treated as commercial, institutional or industrial premises by any other Government agency or Department, in anyway. 
  9. In case of any dispute of water/sewerage bills, the consumer shall approach the concerned Executive Engineer for dispute redressal by paying 50% of the disputed amount alongwith the application. The application, not accompanied by the proof of deposit of 50% amount, shall be rejected. The consumer can file an appeal to the concerned Superintending Engineer within thirty days of issue of the order of dispute redressal by the Executive Engineer provided the consumer paid 50% of the disputed amount. The decision of Superintending Engineer shall be final and binding on the both parties. 
  10. Any insanitary connection, if detected, by the department shall be disconnected immediately without giving any notice and shall be restored only after necessary rectification by consumer and a fee of Rs.1000/- shall charged as fine or penalty in such cases. 
  11. Electric pumps installed direct on supply line shall not allowed to any consumer. Wherever the electric pumps installed direct on supply line is detected a penalty of Rs. 1200/- shall be levied. It shall be directed by Public Health Engineering Department to all consumers through handbills proclamation that direct online pumps shall be confiscated and supply to the defaulting consumer shall be disconnected.

 

(RAJ KUMAR)                       

Financial Commissioner and Principal Secretary to

Government Haryana, Urban Local Bodies Department.  

I Accept, Download the Form   I Decline

Website Last Updated on:

Visitor No.: PHED

Nodal Officer for website related queries is EE (Co-ordination), Contact at (0172-2583005), eecoord[at]gmail[dot]com. Best view in Google Chrome and IE 10 above